My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2006_EP-06-0351 thru EP-06-0400_ - EP-06-360
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2006
>
EP-06-0351 thru EP-06-0400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2006_EP-06-0351 thru EP-06-0400_ - EP-06-360
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:37:55 AM
Creation date
1/23/2016 5:35:16 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-06-360
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2006\EP-06-0351 thru EP-06-0400
Year2
2006
Address
N & S SIDE OF SEIDNER RD.
Supplemental fields
APN
Applicant
MOZINGO CONSTRUCTION,INC
City
Cross Ref
DocCategory
Permits
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
10/12/2006 15:49 209-848-0161 MOZINGO CONSTRUCTION PAGE 05/10 <br /> APN: 22-9-170-1 1 <br /> FRANCISCO APN: 229-170-76 <br /> NALLENBERGER <br /> LATERAL "C 23+40 dd" <br /> 717 <br /> LATERAL "B" <br /> APN: 229-170-46 I APN: 229-170-45 <br /> 55JID I � 55JID <br /> LATERAL "C 23+40 dd" <br /> I � <br /> Lu <br /> APN: 229-170-93 I = APN: 229-170-55 <br /> hOGAN MFG, INC. 40 Rood �OW NORTON <br /> -PLAN VFW <br /> 1"=20' a <br /> 4 <br /> C`L=143.1' <br /> w <br /> EP-142.8' <br /> I <br /> 140 <br /> I <br /> P_R0Pp,SED_1,,v„- I I 130 <br /> 48"& 5A �FV-54m "(CLASS 4) RGR P - <br /> I <br /> EVATION VIEW COMMENTS: <br /> 1, REMOVE ASPHALT. <br /> S- .CALF 2, DIG DOWN AND REMOVE OLD PIPELINE. <br /> H:1"=20' 3. MAKE BED FOR R.G.R,C.P, <br /> V:1 ,10° 4. BACKFILL IN S" LIFTS, USE VIBRATORY ROLLER <br /> COMPACTOR TO ACHIEVE +989 COMPACTION. <br /> 5. COORDINATE FINAL FILL (ASPHALT) WITH S.J. CO- <br /> ROAD DEPT. <br /> �CLCJNIN MAP XM' THIS PLAT IS INSERTED FOR LOCATION PURPOSES ONLY AND NO REW 511-Ily IS ASSUMED HEREUNDER. <br /> f SOUTH SAN JOAQUIN IRRIGATION DISTRICT <br /> :b HENRY ROAD CROSSING <br /> ` REPLACMENT—LATERAL "Br' <br /> SECTION DWG N4. <br /> LATERAI.'B' 35&38 T,1S.,R9E, <br /> HENRY I$p- 2006_P;pingv2.dwg <br /> PROJECT LOCATION ORAWN BY: RAY HELLSTROM <br /> DATE: MARCH 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.