My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2011_PS-1100001 thru PS-1100500_ - PS-1100061
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2011
>
PS-1100001 thru PS-1100500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2011_PS-1100001 thru PS-1100500_ - PS-1100061
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:50:08 PM
Creation date
1/23/2016 4:45:40 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1100061
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2011\PS-1100001 thru PS-1100500
Year2
2011
Application
PS-1100061
Supplemental fields
APN
Applicant
Woodbridge Irrigation District
City
Stockton
Cross Ref
DocCategory
Permits
Type (2)
Encroachment Permit
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PS-1100061 January 5. 2011 <br /> SPECIAL CONDITIONS FOR <br /> WID — INDIANA ST. &WOODBRIDGE RD. <br /> ENCROACHMENT PERMIT <br /> 1. Maintain traffic controls for all roads. Traffic control delays shall not exceed 15 minutes. <br /> Two-way traffic shall be maintained during non-working hours with excavated areas backfilled or <br /> plated. <br /> 2. Access to all properties shall be maintained at all times except when work is occurring at the <br /> access point. Minimal delays will be allowed to provide access within the work zone area. <br /> Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br /> contractor shall be replaced with in-kind or better materials. <br /> 3. Residents and businesses shall be notified in writing, as approved by the County, 48-hours in <br /> advance of any impacts to their access. <br /> 4. Any areas where parking is to be restricted shall have signs noticing the time period placed at <br /> least 48 hours in advance of the work. <br /> 5. No trench cutting of County roads shall occur between November 1 and March 31. <br /> 6. Final paving for trench repair or road resurfacing shall be per Caltrans' specifications. <br /> 7. All future maintenance of the pipeline and related facilities within the County right-of-way will <br /> require a San Joaquin County Encroachment Permit. <br /> 8. Trenches shall be maintained in a smooth and even condition to the satisfaction of the County <br /> throughout the project limits at all times. <br /> 9. All trenches shall be completely backfilled or shored and plated at the end of each workday, and <br /> the roadway restored to two-way traffic. If plating is to be used, a trench shoring and plating plan <br /> suitable for traffic loadings shall be prepared by a registered civil engineer and submitted for prior <br /> approval by the County. <br /> 10. The contractor shall use San Joaquin County Standard R-29 when backfilling trenches within the <br /> County right-of-way. Where the existing road structural section is below standard, a minimum <br /> section of 3 inches of asphalt concrete over 8 inches of aggregate base shall be required. <br /> 11. Temporary pavement shall be provided for all trench areas within three days of pavement <br /> removal or by Friday of each week, whichever is more restrictive. <br /> 12. Final trench paving will also be required to be placed when interruptions or delays of the work <br /> exceed two (2) weeks. <br /> 13. Roadway areas subject to pavement cuts shall receive a 0.12-foot asphalt concrete overlay from <br /> the centerline (or lane line) to the edge of the traveled way. If the pavement is disturbed on both <br /> sides of the centerline (or adjacent lane), then the entire roadway (or affected lanes) shall be <br /> resurfaced. All pavement conforms shall be ground to provide a flush surface. Contractor shall <br /> grind and overlay within 10 working days of permanent trench paving. Shoulder areas shall be <br /> brought up to the finish grade as directed by the County. <br />
The URL can be used to link to this page
Your browser does not support the video tag.