My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
M558 - M564
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer M
>
M558 - M
>
M558 - M564
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 9:51:58 AM
Creation date
1/22/2016 6:48:46 PM
Metadata
Fields
Template:
Large Plans - LP
Project
Project Plans for Mountain House Parkway Resurfacing
Limits
500' south of Interstate 580 to 1,100' south of Interstate 205
Year
2003
Project Engineer
Jeff Levers
Roads Worked
Mountain House Pkwy.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
M558 - M564
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
N3MV80 3WVN 3313 <br /> i <br /> ADJUST FRAME AND COVER TERMINAL SYSTEM <br /> PAVEMENT REPAIR DETECTOR HANDHOLE DRIVEWAYS TYPE ET <br /> Conform ® E.P. <br /> Location Quantity Location Quantity Type Number Area Location Quantity E.P. <br /> 43 Locations Throughout Project 1,749 S.Y. Type E 13 Locations 615 S.Y. Sta. 58+76 Left 1 Each R R 8' <br /> 9 J Sta. 59+93 (Right) 60 1 Each (Left) i <br /> Sta. 61+46 (Right) 52' 1 Each <br /> Sta. 63+10 (Right) 73' 1 Each Conform <br /> Sta. 63+12 (Right) 38' 1 Each <br /> Sta. 63+21 (Left) 9' 1 Each Existina Width <br /> Sto. 64+57 (Right) 90' 1 Each 12' Min. <br /> Sta. 65+27 (Left) 4' 1 Each <br /> Sta. 65+28 (Left) 54' 1 Each TYPE E <br /> Sta. 65+44 (Left) 83' 1 Each <br /> Sta. 66+84 (Left) 70' 1 Each ASPHALT C 0 N C R ETE <br /> PLANING ASP HALT <br /> Sta. 66+63 (Left) 6r , Each (TYP E A) Variable depth Asphalt Concrete <br /> Sta. 83+44 (Right) 15 1 Each over existing paved driveway. <br /> CONCRETE PAVEMENT Sta. 88+38 (Right) 26' 1 Each Location Quantity <br /> Sta. 94+72 (Left) 14' 1 Each TERMINAL SYSTEM R = Conform to Existing Radii. <br /> Location QuantityMainline 7,627 Tons <br /> Total 14 Each Driveways 77 Tons <br /> Begin Project 183 S.Y. Pavement Repair 933 Tons (TYPE CAT-350 TYPICAL DRIVEWAY DETAILS <br /> Intersections Total 8,637 Tons Location Quantity <br /> N/B 1-580 Off Ramp 38 S.Y. f <br /> N/B 1-580 On Ramp 150 S.Y. Sta. 54+55 1 Each <br /> Schulte Road West 419 S.Y. Stu. 62+18 1 Each <br /> Schulte Road East 528 S.Y. <br /> Total 2 Each <br /> Berkeley Road 205 S.Y. <br /> Bridges/Ove j <br /> 1-580 Overcrossing 345 S.Y. <br /> 29C-083L (CA Aqueduct)29C-083R (A Aqueduct) 366 S.Y. ADJUST FRAME AND PAVEMENT REINFORCING f <br /> 29C-335 (Delta—Mendota Canal) 334 S.Y. COVER ( 18" <br /> SDI FAB R I C <br /> i <br /> Longitudinal <br /> Sta. 46+71 to Stu. 48+22 (Left) 67 S.Y. LOCatIOn Quantity Location Quantity 2" Standard frame and <br /> Dia. or Sq cover assembly <br /> Sta. 47+29 to Sta. 48+22 (Right) 42 S.Y. Sta. 44+69 (Left) 31' 1 Each Sta. 43+06 to Sta. 125+50 20,451 S.Y. A.C. Overlay 6„ (Refer to S.J.Co. Std. <br /> Sta. 51+60 to Sta. 52+10 (Right) 67 S.Y. 1 Each Dwg. CW—M1 .) <br /> Sta. 59+69 to Sta. 62+75 (Right) 136 S.Y. <br /> Sta. 45+73 (Left) 31' <br /> Schulte Road East 115 S.Y. Total 2 Each 4" <br /> Sta. 60+96 to Sta. 62+84 (Left) 84 S.Y. TERMINAL SYSTEM 8.. <br /> Sta. 65+54 to Sta. 88+04 (Left) 1,000 S.Y. (TYPE B) Exist. Roadway— 6" <br /> P.C.C. 3 ' <br /> End Project 178 S.Y. <br /> Location Quantity <br /> Total 4,640 S.Y. Undisturbed f Exist. survey monument <br /> PORTLAND CEMENT Sta. 56+25 (Right) 1 Each basement soil to remain in place and <br /> Sta. 58+51 (Left) 1 Each <br /> CONCRETE PAVEMENT undisturbed. <br /> Sta. 92+42 (Right) 1 Each <br /> Location Quantity Sta. 94+65 (Left) 1 Each SURVEY MONUMENT DETAIL <br /> Total 4 Each <br /> ADJUST FRAME AND COVER Schulte Road East 67 C.Y. <br /> (WATER VALVE <br /> ADJUST FRAME AND Location Quantity <br /> COVER (MANHOLE) Sta. 63+94 (Left) 58' 1 Each <br /> Sta. 63+95 (Left) 61' 1 Each <br /> Location Quantity Sta. 63+97 (Left) 58' 1 Each <br /> Sta. 67+39 (Left) 61' 1 Each <br /> Sta. 62+74 (Left) 50' 1 Each Sta. 70+49 (Left) 41' 1 Each METAL BEAM GUARD RAIL <br /> Sta. 64+30 (Right) 40' 1 Each Sta. 73+01 (Left) 34' 1 Each <br /> Sta. 64+43 (Left) 72' 1 Each Sta. 73+09 (Left) 34' 1 Each <br /> Sta. 66+05 (Left) 69' 1 Each Sta. 73+11 (Left) 34' 1 Each Location Quantity See Note Below <br /> Sta. 70+55 (Left) 50' 1 Each Sta. 76+10 (Left) 29' 1 Each Existing Surface <br /> Sta. 74+00 (Left) 40' 1 Each Stu. 78+02 (Left) 26' 1 Each Sta. 54+56 to Stu. 54+69 25 L.F. <br /> END SECTION <br /> Stu. 76+00 (Left) 38' 1 Each Sta. 79+10 (Left) 24' 1 Each Sta. 56+00 to Sta. 56+25 (Right) 25 L.F. <br /> Sta. 78+46 (Left) 34' 1 Each Sta. 79+10 (Left) 25' 1 Each Sta. 58+51 to Stu. 58+76 (Left) 25 L.F. Location Quantity <br /> Sta. 82+00 (Left) 28' 1 Each Sta. 82+09 (Left) 20' 1 Each Sta. 62+06 to Sta. 62+18 25 L.F. <br /> Sta. 92+58 Left 1 Each ' <br /> Sta. 86+80 (Left) 25' 1 Each Sta. 82+11 (Left) 20' 1 Each Sta. 92+17 to Sta. 92+42 (Right) 25 L.F. (Left) 0.70 Asphalt <br /> Stu. 87+01 (Right) 22' 1 Each Sta. 88+79 (Left) 25' 1 Each Sta. 92+33 to Sta. 92+58 (Left) 25 L.F. Sta. 94+49 (Right) 1 Each Concrete (Type A).• <br /> Sta. 88+80 (Left) 28' 1 Each Sta. 94+49 to Sta. 94+74 (Right) 25 L.F. Total 2 Each <br /> Total 11 Each <br /> Sta. 88+82 (Left) 28' 1 Each Sta. 94+65 to Stu. 94+90 (Left) 25 L.F. PAVEMENT REPAIR DETAIL <br /> Sta. 89+27 (Left) 33' 1 Each Total 200 LF. <br /> Total 18 Each Note: Width (4' minimum), length <br /> and locations to be determined <br /> by the Engineer. <br /> I <br /> * — Pavement Repair at the conforms of the <br /> California Aqueduct bridges (Nos. 29C-083R&L, j <br /> Sta. 56+00 to Sta. 61+00 ONLY) shall be <br /> 0.80' Asphalt Concrete (Type A). <br /> ADJUST FRAME AND TERMINAL SYSTEM <br /> COVER (MONUMENT) TYPE SRT) <br /> Location Quantity TRAFFIC SIGNAL <br /> Location quantity LOOP DETECTORS <br /> Sta. 63+73 (Right) 120' 1 Each SHOULDER BACKING <br /> Sta. 64+16 (Right) 44' 1 Each Sta. 56+00 (Right) 1 Each Location Quantity <br /> Sta. 64+17 (Left) 9' 1 Each Location Quantity Sta. 92+17 (Right) 1 Each <br /> Sto. 69+00 (Left) 9' 1 Each Sta. 92+33 (Left) 1 Each Schulte Road W/B 10 Loops <br /> Sta. 88+94 (Right) 6' 1 Each Sta. 89+48 to Sta. 126+00 (Left) 152 Tons Sta. 94+74 (Right) 1 Each Sto. 65+42 8 Loops <br /> Sta. 116+31 (Center) 1 Each Sta. 64+35 to Stu. 126+00 (Right) 310 Tons Sta. 94+90 (Left) 1 Each Sta. 94+77 1 Loop <br /> ,_ <br /> Total 6 Each Total 462 Tona Total 5 Each Total 19 Loops <br /> ,y t <br /> bc`I .� ? ). tt t <br /> i <br /> TOTAL <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE APPROVAL RECOMMENDED DATE i <br /> SAN .JOA UIN SCALE AS SHOWN SUMMARY OF QUANTITIES MOUNTAIN HOUSE PARKWAY RESURFACING SN� SHEETS <br /> COUNTY O F Q C 0 N STR U CTI O N DETAILS (500' south of interstate 580 to 1,100' south of Interstate 205) 7 7 <br /> FILE NAME-1 DRAWERSHEET NO. ACAD REVISIONS DATE <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.