My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
S418 - S419
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer S
>
S322 thru S431
>
S418 - S419
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2016 3:37:28 PM
Creation date
1/22/2016 8:27:01 PM
Metadata
Fields
Template:
Improvement Plans
Supplemental fields
DocCategory
Improvement Plans
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COUNTY OE SAN JOAQUIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> ENGINEERING DIVISION <br /> CONSTRUCTION OE TRAFFIC SIGNAL <br /> AND SAFETY LIGHTING <br /> AT <br /> STATE ROUTE 120 / AUSTIN ROAD <br /> To be supplemented by Standard Plans dated July, 1999 <br /> PROJECT NOTES <br /> 1. THE CONTRACTOR SHALL FURNISH ALL MATERIALS AND SHALL PERFORM ALL LABOR IN ACCORDANCE WITH THE REQUIREMENTS OF <br /> THE STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS AND STANDARD PLANS DATED JULY 1992. <br /> 2. IT SHALL BE THE RESPOSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE AND LOCATION OF ALL UNDERGROUND FACILITIES, <br /> PUBLIC OR PRIVATE, AND TO PROTECT THEM FROM DAMAGE. THE CONTRACTOR SHALL BEAR THE TOTAL EXPENSE OF REPAIR OR <br /> REPLACEMENT OF ANY UNDERGROUND FACILITIES DAMAGED BY HIS OPERATIONS. QUANTITY AND EXACT LOCATIONS OF ALL UTILITIES SAN JOAQUIN COUNTY, CA <br /> TO BE DETERMINED BY CONTACTOR 48 HOURS BEFORE BEGINNING WORK. PHONE USA (800) 227-2600 PRIOR TO DIGGING. To Sacramento <br /> 3. THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY. <br /> 4• CONTRACTOR IS RESPONSIBLE FOR TRAFFIC CONTROL. TRAFFIC CONTROL MEASURES SHALL CONFORM TO THE CALTRANS TRAFFIC MANUAL. SR 120 To Escalon <br /> 5. ALL PULL BOXES ARE TO BE NO. 5 UNLESS OTHERWISE NOTED ON PLAN. MANTECA <br /> 6. POSITIONING OF SIGNAL STANDARDS, PULL BOXES, AND DETECTORS SHALL BE VERIFIED BY CALTRANS TRAFFIC SIGNAL OPERATIONS PROJECT <br /> PRIOR TO INSTALLATION. a LOCATION <br /> 7. LOOP DETECTORS SHALL BE CENTERED IN EFFECTIVE LANE WIDTHS UNLESS OTHERWISE NOTED ON PLAN OR DIRECTED O <br /> BY THE ENGINEER. 99 z <br /> z <br /> F <br /> 8, THE CONTRACTOR SHALL PROVIDE AND INSTALL ALL EQUIPEMENT AND MATERIALS NECESSARY FOR THE SIGNAL TO OPERATE AS SHOWN <br /> IN THE PHASE DIAGRAM. a <br /> 9. SIDEWALKS REMOVED FOR INSTALLATION OF SIGNAL FOUNDATION AND PULL BOXES SHALL BE REMOVED TO THE NEAREST SCORE MARK. <br /> SCORE MARK SHALL BE SAWCUT PRIOR TO REMOVAL. <br /> 10. CONTRACTOR SHALL CONTACT PACIFIC GAS & ELECTRIC TO CONFIRM POWER SUPPLY VOLTAGE. - <br /> 11. CONTRACTOR SHALL NOTIFY THE COUNTY ENGINEERING DIVISION AND CALTRANS PERMIT ENGINEER TWO WORKING To Los Angeles <br /> DAYS BEFORE STARTING THE NEW TRAFFIC SIGNAL CONSTRUCTION. ' 1 / <br /> 12. THE CONTRACTOR SHALL NOT PROCEED WITH ANY WORK CALLED FOR ON <br /> THESE PLANS UNTIL THE COUNTY ENGINEER'S SIGNATURE APPROVAL IS AFFIXED 0 C A T 0 N M A P v <br /> HEREON AND ALL APPLICABLE PERMITS HAVE BEEN OBTAINED. AN APPROVED SET <br /> OF PLANS SHALL BE ON THE JOB SITE DURING ANY CONSTRUCTION. � I c <br /> S <br /> 13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPORTING ALL CONFLICTS, I , T. <br /> ERRORS, OMISSIONS, ETC. TO THE ENGINEER IMMEDIATELY UPON DISCOVERY. IF <br /> SO DIRECTED BY THE ENGINEER, THE CONTRACTOR SHALL STOP WORK UNTIL <br /> REMEDIAL ACTION CAN BE TAKEN. ANY COSTS RESULTING FROM THE APPLICABLE STANDARD PLANS JULY 1999) <br /> CONTRACTOR'S FAILURE TO REPORT OR FAILURE TO STOP WORK AS DIRECTED <br /> WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. ES-1A ES-1B ES-2A ES-2C ES-2D ES-3A ES-3B ES-3C ES-3D <br /> 14. THE CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE <br /> RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF ES-3E ES-4B ES-5A ES-5B ES-5C ES- 5E ES-6A ES-6B ES-6K ES-6M ES-6MA ES-6S <br /> CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND ES-6T ES-8 ES-10 ES-11 ES-13 <br /> PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE <br /> LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL <br /> DEFEND, INDEMNIFY AND HOLD THE OWNER AND ENGINEER HARMLESS FROM ANY <br /> AND ALL LIABILITY, REAL OR ALLEGED IN CONNECTION WITH THE PERFORMANCE <br /> OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE <br /> NEGLIGENCE OF THE OWNER OR ENGINEER. <br /> 15. THE CONTRACTOR SHALL MAKE AN ON-SITE INSPECTION PRIOR TO PROVIDING COUNTY OF SAN JOAQUIN <br /> ANY PROPOSALS TO DETERMINE ANY AND ALL ITEMS NOT SHOWN AS BID ITEMS ON <br /> THE PROPOSAL SHEETS, BUT WHICH MAY BE NECESSARY TO PERFORM A �— <br /> N <br /> E T <br /> DEX <br /> Submitted S�t`i 8 2000 <br /> COMPLETE AND ACCEPTABLE JOB. <br /> 16. TRAFFIC ENGINEERING SERVICES WILL NOT BE RESPONSIBLE FOR MANUEL LOPEZA.C.E. C28054 <br /> OR LIABLE FOR ANY UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS. ALL <br /> CHANGES TO THESE PLANS SHALL BE IN WRITING AND MUST BE APPROVED BY THE DIRECTOR OF PUBLIC WORKS <br /> COUNTY ENGINEER. <br /> 17. THESE PLANS ACCOMPANIED BY SEPERATE SET OF SPECIAL PROVISIONS. T SHEET. ` ` ` ` ` " ` ` ` " " ` " a " ` ` ` " ` ` " ` ` ` ` " " ` ` ` ` ` ` " ` ` ` " ` ` " ` ` ` " ` O 2 CITY OF MANTECA <br /> TRAFFIC SIGNAL AND SAFETY FIGHTING PLAN � � . < < . . � . 2 OF 2"_ <br /> Submit+ ' 2000 <br /> . . _ <br /> 18. ALL CONDUIT UNDER EXISTING PAVEMENT SHALL BE INSTALLED BY TRENCHING OR BORE AND JACKING METHOD. <br /> MICHAEL F BRINTON R.C.E. 18420 <br /> DIRECTOR OF PUBLIC WORKS <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE SUBMITTED DATE APPROVED DATE nSHETOTAL <br /> TRAFFIC SIGNAL PLANSHEETSGIP 2i2QDD COUNTY OF SAN JOAQUIN TRAFFICSTATE ROUTE 120/AUSTIN ROAD2 <br /> FILE N E DRAWER SHEET N0. ACAD REVISIONS DATE <br /> c:\san joaquin county\austin <br />
The URL can be used to link to this page
Your browser does not support the video tag.