My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP1443 - SP1449
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP1255 - SP1877
>
SP1443 - SP1449
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 3:46:50 PM
Creation date
1/23/2016 12:19:27 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Taft Park Area Resurfacing
Year
1995
Project Engineer
M. Saqqa
Roads Worked
Mourfield Ave., Clayton Ave., Odell Ave.
Red Lines
No
Supplemental fields
Classification
Improvement Plans
Cross Ref
SP1443 - SP1449
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Conform 0 E.P. <br /> E / <br /> Conform 1 Conform <br /> Existing Width I I <br /> 12' Min. 1 <br /> 0.30' Asphalt Concrete over Variable depth Asphalt Concrete <br /> shaped and compacted over existing paved driveway. <br /> native material. <br /> R = Conform to existing radius. <br /> TYPE D TYPE E <br /> TYPICAL DRIVEWAYS <br /> 0 <br /> 0 <br /> s r- <br /> 0 <br /> m <br /> z <br /> o D <br /> m See Note Below <br /> s � Existing Surface <br /> N <br /> D <br /> C <br /> M <br /> = 0.60' Asphalt Concrete <br /> EAI L 9 <br /> z Note: Width, length and locations to be <br /> o determined by the Engineer. <br /> A PAVEMENT REPAIR DETAIL <br /> 0 <br /> z <br /> 0 <br /> ml COUNTY OF SAN JOAQUIN No SCALE CONSTRUCTION DETAILS TAFT PARK AREA RESURFACING she f 7 <br /> Drawn By Date Project Engineer Date Checked Date _ Submfit/ted Date r al eco mended ate <br /> l Q 'IS 71/'1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.