My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP1443 - SP1449
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP1255 - SP1877
>
SP1443 - SP1449
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 3:46:50 PM
Creation date
1/23/2016 12:19:27 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Taft Park Area Resurfacing
Year
1995
Project Engineer
M. Saqqa
Roads Worked
Mourfield Ave., Clayton Ave., Odell Ave.
Red Lines
No
Supplemental fields
Classification
Improvement Plans
Cross Ref
SP1443 - SP1449
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ADJUST MANHOLE PLANING ASPHALT SHOULDER BACKING <br /> FRAMES AND COVERS CONCRETE PAVEMENT Location Quantity <br /> Location Quantity Location Quantity Mourfield Ave. <br /> Sto. 36+40 to Sta. 6+78 112 Tons <br /> Mourfield Ave. Mourfield Ave. 91 S.Y. Clayton Ave. <br /> Sta. 7+851 (Rt.) 1 Each Clayton Ave. 115 S.Y. Sta. 0+09 to Sta. 16+92 24 Tons <br /> Sta. 11+861 Rt. 1 Each Odell Ave. 86 S.Y. <br /> Sta. 15+861 Rt. 1 Each Odell Ave. <br /> Sta. 24+261 Rt. 1 Each Total 292 S.Y. Sta. 19+89 to Stu. 6+90 26 Tons <br /> Sta. 25+591 Rt. i Each <br /> Sta. 29+041 Rt. 1 Each <br /> Sta. 33+041 iRt. 1 Each Total 162 Tons <br /> 7 Each <br /> Clayton Ave. <br /> Sta. 3+511 Lt.3 1 Each <br /> Sta. 7+001 Lt. 1 Each PAVEMENT REINFORCING FABRIC <br /> Sta. 10+631 Lt. 1 Each <br /> Sta. 13+841 Lt.� 1 Each Location Quantity <br /> 4 Each Mourfield Ave. 6,533 S.Y. <br /> Odell Ave. DRIVEWAYS Type D) Clayton Ave. 3,844 S.Y. <br /> Sta. 7+781 (Rt.) 1 Each Odel Ave. 2,778 S.Y. <br /> Sta. 11+961 Rt. 1 Each Quantity <br /> Sta. 16+011 (Rt.) 1 Each Location Total 13,155 S.Y. <br /> 3 Each No. S.Y. <br /> Mourfield Ave. 17 144 <br /> o <br /> Total 14 Each Clayton Ave. 8 71 ASPHALT CONCRETE (Type B) <br /> a Odell Ave. 19 155 <br /> o r <br /> jtotal as 370 Location Quantity <br /> o y <br /> 3 Mourfield Ave. <br /> ri Roadway 894 Tons <br /> Pavement Repair 208 Tons <br /> a <br /> 1,102 Tons <br /> Clayton Ave. <br /> M PAVEMENT REPAIR Roadway 483 Tons <br /> A Pavement Repair 104 Tons <br /> = Location Quantity DRIVEWAYS (Type E) 587 Tons <br /> 7 Odel Ave. <br /> Mourfield Ave. Quantity Roadway 319 Tons <br /> 23 Sites 503 S.Y. Location Pavement Repair 8 Tons <br /> w ZO Clayton Ave. No. S.Y. <br /> 12 Sites 247 S.Y. 327 Tons <br /> Odell Ave. Mourfield Ave. 48 400 <br /> ;00 Odell Ave. , 15 151 Driveways (Type D) 80 Tons <br /> 2 Sites 17 S.Y. Odell Ave. 13 115 Driveways (Type E) 49 Tons <br /> O Total 767 S.Y. Total 76 666 Total 2,145 Tons <br /> O <br /> COUNTY OF SAN JOAQUIN No scams SUMMARY OF QUANTITIES TAFT PARK AREA RESURFACING Sheet 7 <br /> m h of 7 <br /> Drawn By Date Project Engineer Date Checked Date Sub fitted Date Kprov Recommended Date <br /> 71111w, <br />
The URL can be used to link to this page
Your browser does not support the video tag.