My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP1774 - SP1779
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP1255 - SP1877
>
SP1774 - SP1779
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2024 9:32:22 AM
Creation date
1/23/2016 12:27:34 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Airport Way Resurfacing
Limits
Mortensen Road to 370' s/o Yosemite Avenue
Year
1998
Project Engineer
Jose Zapada
Roads Worked
Airport Wy.
Red Lines
No
Supplemental fields
Classification
Improvement Plans
Cross Ref
SP1774 - SP1779
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Construction Location Conform @ E.P. <br /> � <br /> E.P. <br /> AIRPORT WAY �� <br /> Conform <br /> j � Existin Width <br /> / q7 E.P. 12' Min. <br /> o <br /> 0 � 0.30' asphalt concrete over shaped <br /> N and compacted native material. <br /> T <br /> j TYPE D <br /> cv Conform @ E.P. <br /> Q Planing <br /> / Length T <br /> Conform W1 0.0Q j ,/ r <br /> Q� 8 <br /> Intersecting Street Location Width Width Planing Transition Conform <br /> (Station) W1 W2 Length Length <br /> Mortensen Road (W) 202+00± 24' — — 40' Existin Width <br /> Avenue "D" (E) 206+45± 20' 29' 20' 80' 12' Min. <br /> Trahern Road (E) 229+22± 24' 24' 20' 100' Variable depth Asphalt Concrete <br /> Airport Court (E) 267+94± 25' 29' 20' 45' over existing paved driveway. <br /> Perrin Road (W) 315+25± 20' 35' 20' 50' TYPE E <br /> n Perrin Road (E) 315+25± 22' 27' 20' 70' <br /> o McMullin Road (W) 354+74± 22' 22' 20' 100' TYPICAL DRIVEWAYS <br /> West Ripon Road (E) 368+04± 32' 32' 30' 110' <br /> Almondwood Drive (E) 394+48± 24' 24' — 100' <br /> Nile Avenue (E) 425+15± 24' 34' 20' 50' <br /> 3 Nile Avenue (W) 426+65± 20' 20' 15' 65' Existing <br /> Fig Avenue (E) 451 +58± 21 ' 30' 20' 60' Roadway Width <br /> Peach Avenue (E) 477+90± 20' 23' 10' 70' 0 65'Conc Asphalt <br /> Woodward Avenue (W) 500+01 ± 24' 24' 20' 100' (4' Minimum) Concrete <br /> Woodward Avenue (E 500+01 ± 24' 24' 20' 100' — — <br /> Wawona Street (E) 553+05± 25' 33' 20' 50' — — — — — — <br /> M TYPICAL INTERSECTION DETAILS <br /> itz Note: <br /> 0 <br /> Width, length, and locations to <br /> A be determined by the Engineer. <br /> M <br /> PAVEMENT REPAIR <br /> z <br /> COUNTY OF SAN JOAQUIN NO SCALE CONSTRUCTION DETAILS AIRPORT WAY RESURFACING sheet No. <br /> m (Mortensen Road to 370 s/o Yosemite Avenue) 5 of g <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE SUBMITTED DATE APPR ECOMMENDED DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.