My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP1774 - SP1779
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP1255 - SP1877
>
SP1774 - SP1779
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2024 9:32:22 AM
Creation date
1/23/2016 12:27:34 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Airport Way Resurfacing
Limits
Mortensen Road to 370' s/o Yosemite Avenue
Year
1998
Project Engineer
Jose Zapada
Roads Worked
Airport Wy.
Red Lines
No
Supplemental fields
Classification
Improvement Plans
Cross Ref
SP1774 - SP1779
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ASPHALT CONCRETE <br /> PAVEMENT REPAIR SHOULDER BACKING (TYPE A) <br /> Location Quantity Location Quantity oca Ionuan i y <br /> Throughout Project Mainline (Resurfacing) <br /> (58 Locations) 2,585 S.Y. Sta. 197+00 to Sta. 575+50 6,365 Tons Sta. 197+00 to Sta. 517+50 19,898 Tons <br /> Sta. 537+00 to Sta. 575+50 3,386 Tons <br /> Total 23,284 Tons <br /> PLANING ASPHALT CONCRETE <br /> PAVEMENT <br /> Location Quantity <br /> Mainline <br /> Sta. 197+00 to Sta. 197+50 134 S.Y. <br /> Sta. 517+00 t0 Sta. 517+50 228 S.Y. ASPHALT CONCRETE <br /> Sto. 537+00 to Sta. 537+50 242 S.Y. <br /> Sto. 575+00 to Sta. 575+50 212 S.Y. TYPE B <br /> Intersections 796 S.Y. DRIVEWAYS TYPE "D" Location Quantity <br /> (14 Locations) Pavement Repair 1 ,214 Tons <br /> Quantity Area Intersections (16 Locations) 508 Tons <br /> Total 1 ,612 S.Y. 64 2,321 S.Y. Driveways, Types "D" & "E" 758 Tons <br /> a <br /> Total 2,480 Tons <br /> 0 <br /> ADJUST MONUMENT <br /> 3 > FRAMES AND COVERS <br /> 0 0 <br /> Location Quantity <br /> Sta. 315+18f 1 EACH <br /> 3 Sta. 368+03t 1 EACH PAVEMENT REINFORCING <br /> Sta. 394+43+ 1 EACH DRIVEWAYS TYPE "E " FABRIC <br /> Sta. 420+68f 1 EACH <br /> Sta. 447+12f 1 EACH Location Quantity <br /> Sta. 477+93f 1 EACH Quantity Area <br /> � A Sta. 197+00 to Sta. 227+00 7,334 S.Y. <br /> Sta. 473+52f <br /> EACH 74 2,432 S.Y. (22' wide) <br /> Sta. 500+00± 1 EACH Sta. 227+00 to Sta. 517+00 77,334 S.Y. <br /> = Sto. 552+86f 1 EACH (24' wide) <br /> M <br /> Sta. 537+50 to Sta. 575+00 10,000 S.Y. <br /> 0 Total 9 EACH (24' wide) <br /> Total 94,668 S.Y. <br /> A <br /> M <br /> G <br /> _N <br /> O <br /> Z <br /> COUNTY 0 F SAN J OAQ U I N NO SCALE SUMMARY OF QUANTITIES AIRPORT WAY RESURFACING 6 e f N6. <br /> M (Mortensen Road to 370 s/o Yosemite Avenue) <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE ,.�•,,SUBMITTED DATE APPR ECOMMENDED DATE <br /> E. M. Peterson 5/98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.