My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP2423 - SP2430
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP2417 - SP2850
>
SP2423 - SP2430
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 8:54:37 AM
Creation date
1/23/2016 12:41:51 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Fig Avenue and Peach Avenue Resurfacing
Limits
Airport Way to Union Road
Year
2001
Roads Worked
Fig Ave., Peach Ave.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP2423 - SP2430
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COUNTY OF SAN JOAQUIN <br /> �+ DEPARTMENT OF PUBLIC WORKS <br /> STOCKTON , CALIFORNIA <br /> a FIG AVENUE AND PEACH AVENUE RESURFACING <br /> y0- <br /> ADR-A (Airport Way to Union Road) <br /> uwa' <br /> RGA' <br /> P" °o ZAI ROA°, *� To Be Supplemented by Standard Plans Dated July 1992 <br /> 000wAR, AVE COUNTY OF SAN JOAQUIN <br /> ErrEm�,� �' �h Submitted 2001 ��� �C <br /> 1 <br /> a. g No. c2aosa <br /> $II L MANU L LOPE E. 28054 *' E■P. 3-31-oz <br /> 9 o o <br /> SEDAN <br /> o DIRECTOR OF PUB IC WORKS �9T��I�IL/a`Q <br /> of o <br /> OR � 'uNd Nx e. <br /> AV <br /> 0 <br /> VLeiTsINDEX OF SHEETS <br /> n PROJECT 1 TITLE PAGE <br /> LOCATIONS a MOND400D cre <br /> Q� 2 OLEANDER AVENUE TYPICAL SECTION <br /> LION AND GENERAL NOTES <br /> m OA� 3 FIG AVENUE TYPICAL SECTION 1� <br /> i <br /> 4 PEACH AVENUE TYPICAL SECTION <br /> pPa 5 ROADWAY WIDENING SCHEDULE , <br /> M o PEre�N �o 0 <br /> 6 FIG AVENUE <br /> �� - 7 PEACH AVENUE 'n <br /> 8 CONSTRUCTION DETAILS AND <br /> SUMMARY OF QUANTITIES <br /> The Contractor shall possess a Class A or Class C-1ADPORT 'T 2 <br /> oTaAREreN Rono license at the time this contract is awarded.APPLICABLE STANDARD PLANS <br /> £ Q A10A, A108 4 <br /> A MORTFNSEN ROAD ABBREVIATIONS <br /> k1 <br /> M c° (in addition to listings in S.P. A10A) � <br /> o — EP = Edge of Pavement <br /> 0 Diameter S.J.Co.Std. = San Joaquin County Standard <br /> RdwPROJECT LOCATION MAP Roadwny S.D.I. = Stormsrd Drains <br /> ns <br /> Son. Sanita Inlet <br /> San. <br /> � Const. = Center Line of Construction <br /> PROJECT ENGINEER I DATE CHECKED DATE "SUBMITTED DATE AIWOVED DATE Sheet No. <br /> SOI T `/.�a iic4+�,u •o ��B1trI _ 1 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.