My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP2423 - SP2430
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP2417 - SP2850
>
SP2423 - SP2430
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 8:54:37 AM
Creation date
1/23/2016 12:41:51 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Fig Avenue and Peach Avenue Resurfacing
Limits
Airport Way to Union Road
Year
2001
Roads Worked
Fig Ave., Peach Ave.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP2423 - SP2430
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Show annotations
View images
View plain text
q <br /> Cost. <br /> Limits of Clearing and Grub ling and Mail Box Relocation <br /> GENERAL NOTES: Earthwork I Earthwork <br /> 1 . 0.25' Asphalt Concrete surfacing shall be laced in two 2 (Misc. Areas) I (Misc. Areas) <br /> P 9 P ( ) 4' 10' 10' 4' <br /> layers of approximate equal thickness. See Detail below for See Detail below for <br /> Shoulder Schedule. I Shoulder Schedule. <br /> 2. Surplus material from excavation (earthwork miscellaneous areas) can <br /> be placed immediately adjacent to the excavated areas, to reinforce <br /> existing berms. This Material is to be clean, no Asphalt Concrete Conform L27, I 29, Conform <br /> or other deleterious material. <br /> Existing _ _Roadway <br /> __ __ --- <br /> 3. <br /> _3. All earthwork, except for the final lift of Shoulder Backing, shall --be completed prior to placing the final lift of Asphalt Concrete Shoulder Backing (Typical) 0.25' Asphalt Concrete Overlay <br /> Surfacing. No shoulder backing shall be deposited or drifted <br /> on the final lift of Asphalt Concrete surfacing. <br /> 4. At locations within 50' of roadway intersections, the contractor OLEANDER AVENUE <br /> shall scarify native soil adjacent to pavement to a depth of <br /> 6 inches and blend Shoulder Backing material prior to compaction. TYPICAL SECTION <br /> i 5. Removal of Asphalt Concrete Dike, where shown on the plan, shall <br /> be done in such a manner as not to damage the Existing Asphalt Earthwork <br /> n Concrete surface below the dike. The cost foe removal is included Const. <br /> o in the Lump Sum price of the Clearing and Grubbing item of work. (Misc. Areas) <br /> 3 m 6. Material used for Shoulder Backing shall be "Selected Material" (Top Soil) 10• 4' 4' <br /> a > at the following locations: <br /> m Fiaa Avenue: <br /> Sta. 41 +00 to Sta. 42+00 (left) i Finished Surface <br /> Peach Avenue <br /> s Sta. 10+00 to Sta. 13+00 (left) I 9X <br /> Sta. 15+00 to Sta. 21 +00 ((Rig t) _ <br /> Sta. 16+00 to Sta. 20+00 left) <br /> This material will be measured and paid for as Shoulder Backing Item of work: __ Conform <br /> Approximatly 40 Tons. Shoulder Backing (Typ.) <br /> (A EARTHWORK (Misc. Areas) SHOULDER SCHEDULE <br /> /� ® �j /��/�� t� 1. _. (Right) <br /> RECORD DRAWING (Left) <br /> � FIG AVENUE <br /> 0 Corrections HV _ NW Radius 0.20 Stu. NW Radius 0.20 Sta. <br /> m No *an PEACH AVENUE <br /> SW Radius 0.20 Sta. <br /> 8544` <br /> � Ay.� pu�r, •.., n This Drmvl ;� None <br /> m s' 9 fl�j Volil�f Stu. 4+10 to Sta. 4+70 0.60 Sta. <br /> 0 <br /> A8 m!x + ^ 9� ins;ect!Kn The 9i ii Mlork. Total 1 .00 Sta. Total 0.20 Sta. <br /> COUNTY OF SAN JOA UIN No SCALE TYPICAL SECTION FIG AVENUE AND PEACH AVENUE RESURFACING sheet No. <br /> Q AND GENERAL NOTES 2 of a <br /> DRAWN BY DATE PROJECT ENGINEER I DATE CHECKED DATE SU MITTED DATE APP V UECOMMENDED DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).