My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP2423 - SP2430
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP2417 - SP2850
>
SP2423 - SP2430
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 8:54:37 AM
Creation date
1/23/2016 12:41:51 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Fig Avenue and Peach Avenue Resurfacing
Limits
Airport Way to Union Road
Year
2001
Roads Worked
Fig Ave., Peach Ave.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP2423 - SP2430
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
M (i <br /> R/W ri <br /> Const. <br /> E] Centerline Right of Way (Centerline Survey) = nail <br /> I and stamped washer <br /> Limits of Clearing and Grubbing and Mailbox Relocation <br /> 20' – 35' 2❑ Refer to plans for pavement variations <br /> 10-17' 2 10'-18 I 2 3� Refer to page 5 for Schedule of Roadway Widening <br /> � � <br /> ® Refer to page 6 for Centerline of Construction <br /> 3 3❑ Alignment Scehule. <br /> Earthwork 0'-5' Var. <br /> (Mist. Areas) I Earthwork <br /> * i (Mist. Areas) <br /> See Detail below for I See Detail below for <br /> Conform <br /> Shoulder Schedule. Var. i Ivar� 2% Shoulder Schedule. <br /> _ Conform <br /> Existing Roadway -- <br /> i <br /> Shoulder Backing (Typical) 0.25' Asphalt Concrete Overlay 0.15' A.C. Widening (Typical) <br /> i Areas where shoulder backing is 2FIG AVE <br /> — <br /> > Sta. 12+00 to Sta. 17+00 (Lt.) <br /> TYPICAL SECTION <br /> s m <br /> n Const. Earthwork <br /> (Misc. Areas) <br /> I�✓-10' 4' 4' <br /> – I <br /> Finished Surface <br /> I <br /> Conform <br /> (O 0.25' Shoulder 8acking (Typ.) <br /> NYi �i�.7 Sta. 11 +0o to (Left) <br /> L ft)3+oo z.o sta SHOULDER SCHEDULE (J_t.&Rt.1 <br /> r�gJ EARTHWORK Misc. Areas) SH SCHEDULE <br /> 0 <br /> Sta. 11+00 to Sta. 25+00 14.0 Sta. <br /> Z A ��I�Y �����N - Sta. 18+00 to Sta. 45+00 27.0 Sta. Sta. 30+00 to Sta. 32+00 2.0 Sta. <br /> N Sta. 11+00 to Sta. 13+00 2.0 Sta. Sta. 36+00 to -Sta. 40+00 4.0 Sta. <br /> I� o r.n Total 31 .0 Sta. Total 20.0 Sta. <br /> COUNTY OF SAN JOAQUINNo SCALE TYPICAL SECTION FIG AVENUE AND PEACH AVENUE RESURFACING sheet <br /> 3 of 8 8 <br /> DRAWN BY DATE I PROJECT ENGINEER I DATE I CHECKED DATE SUBM17E"D DATE APP V COMMENDED DATE <br /> 70/ .� T iw2v (j'//Y ��8 D li AO O/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.