My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP2740 - SP2745
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP2417 - SP2850
>
SP2740 - SP2745
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 9:25:48 AM
Creation date
1/23/2016 12:48:52 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Schulte Road Resurfacing
Limits
Mac Arthur Drive to Chrisman Road
Year
2002
Project Engineer
L. Aguilar
Roads Worked
Schulte Rd.
Red Lines
No
Supplemental fields
Classification
Improvement Plans
Cross Ref
SP2740 - SP2745
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Const. <br /> I <br /> Limits of Clearing and Grubbing <br /> and Limits of Mailbox Relocation <br /> 4' 4' 12' I 12' 44' <br /> 1' 22' Pavement Reinforcing <br /> inforcing Fabric 1' <br /> I <br /> I <br /> Conform BY Var. Var. Z 8% Conform <br /> Or <br /> -- ________________ <br /> Existing Roadway J T --- -- <br /> -- � <br /> 0.17' Asphalt Concrete Shoulder Backing <br /> TYPICAL SECTION — SHOULDER -DETAIL 1 (Typ-) <br /> "s Stu. 5+19 to Stu. 57+25 (Left) <br /> Sto. 5+19 to Stu. 11 +40 (Right) <br /> m Stu. 18+20 to Stu. 57+25 (Right) <br /> D <br /> m GENERAL NOTES const. <br /> 0 �1. Placement of Asphalt Concrete overlay shall not begin until the Asphalt Concrete used 12' <br /> in Pavement Repair has been in place for 18 hours. <br /> = Pavement <br /> 2. Shoulder Backing at all intersection radii shall be blended with the top 6" of native soil <br /> material as directed by the Engineer. Payment for blending shall be considered as Reinforcing Fabric Conform <br /> included in the contract unit price paid for Shoulder Backing. <br /> 3. The contractor shall conduct Shoulder Backing operations so as not to disturb or Var. Var <br /> . <br /> obstruct any existing drainage. <br /> 1 <br /> e4. All earthwork, except final grading of the shoulders, shall be completed prior to placing <br /> f—' n final layer of asphalt concrete. No Shoulder Backing shall be deposited or drifted Shoulder Backing <br /> M on the final lift of asphalt concrete surfacing. Existing Roadway <br /> M <br /> SHOULDER DETAIL 2 <br /> z Stu. 11 +40 to Sta.18+20 (Right) <br /> 0 <br /> COUNTY OF SAN JOA UIN NO SCALE TYPICAL SECTION SCHULT£ ROAD RESURFACING sheet 6 <br /> Q (Mac Arthur prior to Chrhman Road) 2 of 6 <br /> DRAW BY DATE PROJECT ENGINEER DATE C CKED DATE <br /> SUBMnTED TE APPROVAL RECOMMENDED DATE <br /> G. .t— ww- G ,d,�l. '%9Q D2 lL�a �n/yp�ea <br />
The URL can be used to link to this page
Your browser does not support the video tag.