Laserfiche WebLink
1 � <br /> 01 1 <br /> of - <br /> 3 1 100' <br /> v; 0 <br /> A.C. Transition .17' A.C. Overlay <br /> �, <br /> N P1 <br /> N <br /> � Note: The planing area from station 21+30 to <br /> +_� 1 50 station 21+75 (Left of centerline of <br /> o o a P w 45 construction) is to be planed to a depth <br /> 0 0 rn P P of 0.70' and the material is to remain in <br /> 0D� 10 <br /> ro (0 N o o N place. <br /> E.P. <br /> R C o 0 o N <br /> TP L Cont. . . TP ' <br /> -0- <br /> 6 <br /> 6 N 7 21 22 31 32 N <br /> 0 <br /> �+ 1" s <br /> R <br /> E.P. <br /> o ; + <br /> 0 <br /> BEGINNING OF PROJECT <br /> D <br /> C>-) LEGEND <br /> 10 <br /> 9 X w ® Variable Depth Asphalt Concrete Overlay. <br /> 0.00 Depth of Asphalt Concrete Pavement Planing. <br /> C <br /> p� X , ■ Limits of Asphalt Concrete Pavement Planing. <br /> h R Conform to Existing Radii. <br /> �., <br /> Y (MHS Existing Maintenance Hole Frames and <br /> CA 1 — 1. Covers to be adjusted to grade. <br /> f I m - Q Place Survey Monument Frame and Cover. <br /> 1 Refer to S.J. Co. Improvement Standards <br /> A I NI M No. CW-M1. See Sheet No. 5 for detail. <br /> �J !; Existing Survey Monument <br /> T <br /> P <br /> COUNTY OF SAN JOAQUM No sCALE PLAN SCHULTE RM ';ESURFACING Sheet No. <br /> (Mac Arthur Drive to Chritman Road) 3 of 6 <br /> DRAWN BY DATE PROJECT ENGINEER DATE C CKED DATE 5 BMI D DATE APPROVAL/I RECOMMENDED DATE <br /> e �/ O /0 <br /> �.(� �s�,.l• � roGploL <br />