My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP2866 - SP2876
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP2851 - SP4195
>
SP2866 - SP2876
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 8:24:06 AM
Creation date
1/23/2016 12:51:40 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Murphy Road Resurfacing
Limits
Milgeo Avenue to River Road
Year
2003
Project Engineer
Ponch Trevisso
Roads Worked
Murphy Rd.
Red Lines
No
Supplemental fields
Cross Ref
SP2866 - SP2876
DocCategory
Improvement Plans
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COUNTY OF SAN JOAQUIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> N STOCKTON , CALIFORNIA <br /> PROJECT <br /> Y LOCATION MI Ll 0 AVE <br /> aINrov scum _AVE_ MURPHY ROAD RESURFACING <br /> _ <br /> (Milgeo Avenue to River Road) <br /> To Be Supplemented by Standard Plans dated July 1992 <br /> CD <br /> < RrvER. _RQ -- COUNTY OF SAN JOAQUIN <br /> sANTos AVE submitted 6- CDC/-2003 <br /> T <br /> South a COLONY RD ,LOFESS/pl, <br /> ..e �..T <br /> a o z THOMAS RYAN FLINN R.C.E. 23341 <br /> " <br /> to DIRECTOR OF PUBLIC WORKS <br /> • <br /> No. 38465 <br /> EV 3-31-05 <br /> d9TF MILGE !` AVE ' - _ \ INDEX OF SHEETS 9 CIVIL ��Q <br /> - SHEET NO. 1 TITLE PAGE OF Cp1/>�/F�j <br /> �^ SHEET N . 2 TYPICAL SECTION/GENERAL NOTES <br /> PNEP SHEET NO. 3 SHOULDER do EARTHWORK DETAILS <br /> SHEET NO. 4-7 PLANS <br /> SHEET NO. 8 RAILING PLAN Peter D. Martin <br /> _ s SHEET NO. 9 CONSTRUCTION DETAILS <br /> — SHEET N0. 10-11 SUMMARY OF QUANTITIES REGISTERED CIVIL ENGINEER 38465 <br /> t� nn RIPON I, `�,- ✓tip Note: This contract requires a Class A or C-12 license. <br /> v' APPLICABLE STANDARD PLANS <br /> ut AIDA, A108, A77A, A77B, A77C, A77F, <br /> 1 v STANISLAUS COUNTY A77H, A77J, A77K, A87, D87B, T13 <br /> p = o <br /> ABBREVIATIONS <br /> V A (In addition to abbreviations shown on S.P. AIDA) <br /> IN A.C. = Asphalt Concrete S.J. Co. Std. = San Joaquin County <br /> C.&G. = Curb and Gutter Standard <br /> o C.G.&S. = Curb, Gutter and ETW = Edge of Traveled Way <br /> PROJECT LOCATION MAP Sidewalk S.D.I. = Storm Droin Inlet <br /> SCALE: R = Conform to existing Radii R.S.P. = Revised Standard Plans <br /> 0 .5 MILE 1 MILE 2 MILES R & D = Remove and Dispose Trans. = Transition <br /> C.R.T. Controlled Releasing Terminal <br /> ppPROJECT ENGINEER DATE CHE KED DATE APPROVEDDATE Sheet No. <br /> /%l ro��3 '4e wl 1 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.