My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP4013 - SP4024
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP2851 - SP4195
>
SP4013 - SP4024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 8:45:41 AM
Creation date
1/23/2016 12:59:59 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Turner Road Resurfacing
Limits
Jacob Brack Road to Davis Road
Year
2006
Project Engineer
Owen Davis
Roads Worked
Turner Rd.
Red Lines
No
Supplemental fields
Cross Ref
SP4013 - SP4024
DocCategory
Improvement Plans
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CLEANING EXISTING DRAINAGE FACILITIES ROADWAY EXCAVATION IMPORTED BORROW <br /> Location Quantity Location Quantity Location Quantity <br /> 2 Locations (Throughout Project) LUMP SUM Sto. 6+00 to Sto. 7+10 145 C.Y. Sto. 14+50 to Sto. 15+50 (Lt.) 6. C.Y. <br /> Sto. 7+10 to Sta. 9+66 173 C.Y. Sto. 36+70 to Sto. 45+20 (Rt.) 80.9 C.Y. <br /> Sto. 9+66 to Sto. 10+66 79 C.Y. Sto. 74+00 to Sto. 78+80 (Lt.) 75.4 C.Y. <br /> Total 397 C.Y. Sto. 81+04 to Sto. 82+10 (Lt.) 3.4 C.Y. <br /> Sto. 75+80 to Sta. 82+10 (Rt.) 54.6 C.Y. <br /> PAVEMENT REPAIR Subtotal 220.3 C.Y. <br /> Location Quantity Bulk Factor (+40%) 88.1 C.Y. <br /> Total 308.4 C.Y. <br /> 87 Locations (Throughout Project) 1,044 S.Y. <br /> EARTHWORK <br /> MISCELLANEOUS AREAS — TYPE 1 SHOULDER BACKING <br /> PLANING ASPHALT CONCRETE PAVEMENT Location Quantity Location Quantity <br /> Location QuantitySta. 14+50 to Sta. 15+50 (Lt.) 1.00 Sto. Sto. 10+66 to Sto. 194+44 3,816 Tons <br /> N Turner Road Sta. 36+70 to Sta. 45+20 (Rt.) 8.50 Sto. <br /> Sta. 78+48 to Sta. 78+90 103 S.Y. Sto. 74+00 to Sta. 78+80 (Lt.) 4.80 Sto. <br /> Sta. 79+04 to Sto. 82+10 Lt. 3.06 Sta. <br /> Sta. 79+04 to Sto. 79+29 61 S.Y. ( <br /> D Sto. 141+10 to Sto. 141+60 122 S.Y. Sto. 75+80 to Sto. 82+10 (Rt.) 6.30 Sto. <br /> o Sto. 142+48 to Sto. 142+98 122 S.Y. Total 23.66 Sta. <br /> CL c ,, Sto. 193+94 to Sta. 194+44 122 S.Y.m DRIVEWAYS (TYPE D) <br /> ') <br /> N Intersections , <br /> w > Thornton Road (n/o Turner Rd) 211 S.Y. Location Quantity <br /> A Thornton Road (s/o Turner Rd) 148 S.Y. <br /> o Roy Rood (n/o Turner Rd) 68 S.Y. 23 Locations 1,051 S.Y. <br /> Total 957 S.Y. <br /> EARTHWORK <br /> MISCELLANEOUS AREAS — TYPE 2 <br /> ,CL <br /> ADJUST MONUMENT FRAME AND COVER Location Quantity DRIVEWAYS (TYPE E) <br /> North West Quad. of Turner and DeVries 2.00 Sta. <br /> CA Location Quantity South East Quad. of Turner and DeVries 2.00 Sta. Location Quantity <br /> Sto. 36+35 1 Each Total 4.00 Sta. 50 Locations 2,555 S.Y. <br /> 0 <br /> O � <br /> ...� r <br /> w r*� <br /> y o <br /> COUNTY OF SAN JOA UIN NO SCALE SUMMARY OF QUANTITIES TURNER ROAD RESURFACING Sheet No. <br /> Q (Jacob Brack Road to Davis Road) 11 of 12 <br /> DRAWN BY I DATE I PROJECT ENGINEER f DATE D DATE APPROVAL RECOMMENDED DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.