My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP4013 - SP4024
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP2851 - SP4195
>
SP4013 - SP4024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 8:45:41 AM
Creation date
1/23/2016 12:59:59 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Turner Road Resurfacing
Limits
Jacob Brack Road to Davis Road
Year
2006
Project Engineer
Owen Davis
Roads Worked
Turner Rd.
Red Lines
No
Supplemental fields
Cross Ref
SP4013 - SP4024
DocCategory
Improvement Plans
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DRIVEWAYS (TYPE F) PLACE ASPHALT CONCRETE DIKE 36" DIA. CORRUGATED STEEL PIPE <br /> Location QuantityLocation TYPE A Quantity Location 0.109" THICK <br /> Quantity <br /> Sta. 77+60 (Lt.) 61 S.Y. <br /> Sta. 6+45 to Sta. 6+60 (Lt.) 20 L.F. Sta. 76+75 to Sta. 77+15 (Lt.) 40 L.F. <br /> Sta. 6+37 to Sta. 6+56 (Rt.) 15 L.F. <br /> Sta. 10+27 to Sta. 10+66 (Rt.) 55 L.F. <br /> Sta. 10+38 to Sta. 10+50 (Lt.) 15 L.F. <br /> Total 105 L.F. <br /> ASPHALT CONCRETE (TYPE A) <br /> Location Quantity <br /> Sta. 6+00 to Sta. 194+44 8,340 Tons PLACE ASPHALT CONCRETE <br /> MISCELLANEOUS AREAS <br /> Location Quantity SACKED CONCRETE SLOPE PROTECTION <br /> Sta. 6+51 (Rt.) 3 S.Y. <br /> Location Quantity <br /> ASPHALT CONCRETE (TYPE B) Sta. 10+40 (Rt.) 3 S.Y. <br /> N Sta. 79+04 to Sta. 81+04 (Lt.) 86 C.Y. <br /> o Total 6 S.Y. <br /> Location Quantity <br /> Intersections 148 Tons <br /> oD Pavement Repair 209 Tons <br /> 0 -n Driveways 477 Tons <br /> N m A.C. Dike 3 Tons <br /> D A.C. (Misc. Areas) 1 Tons <br /> L4 K <br /> i M Total 838 Tons <br /> PAVEMENT REINFORCING FABRIC <br /> Location Quantity <br /> CD <br /> Sta. 10+66 to Sta. 12+55 (24' Wide) 504 S.Y. <br /> D Sta. 12+55 to Sta. 75+80 (20' Wide) 14,056 S.Y. PLACE MONUMENT FRAME AND COVER <br /> ASPHALT CONCRETE LEVELING sta. 82+10 to sta. 141+60 (20' wide) 13,222 S.Y. <br /> TYPE A Location Quantity <br /> Sta. 142+48 to Sta. 194+44 (20' Wide) 11,547 S.Y. <br /> Location Note Total 39,329 S.Y. Sta. 10+00 1 Each <br /> N Quantity Sta. 89+15 1 Each <br /> No Fabric at Railroad Approach Areas <br /> Sta. 75+80 to Sta. 82+10 538 Tons (Sta. 75+80 to Stu. 82+10) Total 2 Each <br /> v <br /> M <br /> Om <br /> r <br /> p z <br /> z <br /> 0 <br /> COUNTY OF SAN JOAQUIN NO SCALE SUMMARY OF QUANTITIES TURNER ROAD RESURFACING Sheet No. <br /> (Jacob Brack Road to Davis Road) 12 of 12 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECK DATE . APPR2y RECOMMENDED DATE <br /> Vincent �i c41ar06 2 <br /> { <br />
The URL can be used to link to this page
Your browser does not support the video tag.