My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP4109 - SP4128
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP2851 - SP4195
>
SP4109 - SP4128
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 8:52:59 AM
Creation date
1/23/2016 1:02:30 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Colonial Heights Resurfacing Phase 1
Limits
Cortez Avenue, Seville Avenue, Barcelona Avenue, Paloma Avenue, Valencia Avenue, Capistrano Avenue and De Anza Avenue
Year
2006
Project Engineer
Kaila Coppal
Roads Worked
Cortez Ave., Seville Ave., Barcelona Ave., Paloma Ave.
Valencia Ave., Capistrano Ave., De Anza Ave.
Red Lines
No
Supplemental fields
Cross Ref
SP4109 - SP4128
DocCategory
Improvement Plans
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Conform at Existing Expansion Joint or <br /> Saw cut and Conform of Existing Weakened <br /> RAMP DIMENSION SCHEDULE <br /> BCR ' i Plane Joint or Score Mark (Typical). <br /> Ramp Dimensions i R & D Exist. C.G.& Place Truncated Domes <br /> No. Location Quad. Type �� �� Install New C.G.&S. at Curb Ram per <br /> BCR Station B C S L W , p P <br /> 1 Cortez Ave/Balboa Ave NE 2 23+15 (Balboa) 1 23 31.3 ' 36 18.5 <br /> � (Typical). R.S.P. A88A (Typical). <br /> 2 Cortez Ave/Balboa Ave SE 2 24+25 (Balboa) 20.3 31.4 35.7 19.6 - Retaining Curb as <br /> necessary at back <br /> 3 Cortez Ave De Anza Ave SW 2 13+71 (Cortez) 9 22.5 16.5 26.8 �� edge of Sidewalk. <br /> 4 Cortez Ave De Anza Ave NW 2 13+33 (Cortez) 0 15 23 30.3 n 'h Widen Sidewalk <br /> / as required. <br /> 5 Cortez Ave/De Anza Ave SE 3 06+48 (De Anza) 0 19 N/A 37 <br /> 6 Cortez Ave/De Anza AveNE 3 07+33 (Portola) 18 27.5 N/A 19 <br /> 7 Cortez Ave /Thornton Rd SW 3 15+63 (Cortez) 18.5 27.3 N/A 20 Adjust Existing / ,� S' �'X <br /> 8 Cortez Ave /Thornton Rd NW 3 15+51 (Cortez) 0 35 N/A 43 S.D.I. to Final <br /> FL Grade Front Edge -_- <br /> 9 Seville Ave/Balboa Ave SE 3 .19+76 (Balboa) 8 26 N/A 27.3 .po�' of Sidewalk <br /> 10 Seville Ave/Balboa Ave NE 2 20+89 (Balboa) 17.6 27 37.7 35.4 � % (Flowline). <br /> i 9 <br /> 11 Barcelona Ave/Capistrano Ave SW 3 06+76 (Barcelona) 37 45.2 N/A 18 <br /> ° � For Section Detail A-A <br /> 12 Barcelona Ave/Capistrano Ave SE 3 09+91 (Capistrano) 20.4 31.5 N/A 19.9 4.0' Min. <br /> a See Sheet 16 <br /> 13 T-Inter. Barcelona Ave/Capistrano Ave 1 06+99 (Barcelona) 0 7.9 N/A 24 TYPE 2 RAMP <br /> i <br /> 0 >14 De Anza Ave/Barcelona Ave NW 2 10+50 (Barcelona) 20.5 30 38.5 24.2 <br /> o v 15 De Anza Ave/Barcelona Ave NE 2 00+58 (De Anza) 20.5 39.5 26 30.8 Conform at Existing Expansion Joint or <br /> Saw Cut and Conform at Existing Weakened <br /> c m 16 T-Inter. Barcelona Ave/De Anza Ave 1 1 1+25 (Barcelona) 0 7.9 N/A 24.5 BCR iii i Plane Joint or Score Mark (Typical). <br /> M Z 17 Barcelona Ave/Thornton Rd SW 3 17+99 (Barcelona) 12.4 20.4 N/A 20.3 - -- -� i1--�- ----- <br /> r m 18 Barcelona Ave/Thornton Rd NW 3 17+55 (Barcelona) 20.5 34.8 N A 23.5 ' <br /> R & D Exist. C.G.&S Place Truncated Domes <br /> � co '� '� � � Install New C.G.&S. at Curb Ramp per <br /> s ' (Typical). R.S.P. A88A (Typical). <br /> Retaining Curb as <br /> o necessary at back <br /> edge of Sidewalk. <br /> N 1:1 (Typ.) New C� J ,� Widen Sidewalk <br /> Concrete as required. <br /> Sidewalk <br /> 6" <br /> (TYP•) <br /> u <br /> Front Edge - <br /> v 1� �p �' of Sidewal <br /> o (Flowline). <br /> m <br /> GUTTER DETAIL <br /> Z AT SDI LOCATIONS 4.0' Min. TYPE 3 RAMP <br /> 0 <br /> COUNTY OF SAN JOA UIN w scxx CONSTRUCTION DETAILS COLONIAL HEIGHTS RESURFACING PHASE 1 Sheet No. <br /> Q (Various) 17 of 20 <br /> DRAWN BY DATE I PROJECT ENGINEER DATE CH KED DATE APPROVAL REC MENDED DATE <br /> Enrique Sifva 061061 1V K &A <br />
The URL can be used to link to this page
Your browser does not support the video tag.