My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP4109 - SP4128
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP2851 - SP4195
>
SP4109 - SP4128
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 8:52:59 AM
Creation date
1/23/2016 1:02:30 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Colonial Heights Resurfacing Phase 1
Limits
Cortez Avenue, Seville Avenue, Barcelona Avenue, Paloma Avenue, Valencia Avenue, Capistrano Avenue and De Anza Avenue
Year
2006
Project Engineer
Kaila Coppal
Roads Worked
Cortez Ave., Seville Ave., Barcelona Ave., Paloma Ave.
Valencia Ave., Capistrano Ave., De Anza Ave.
Red Lines
No
Supplemental fields
Cross Ref
SP4109 - SP4128
DocCategory
Improvement Plans
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PLANING ASPHALT PAVEMENT REPAIR ADJUST FRAMES AND GRATES <br /> CONCRETE PAVEMENT Location Quantity (STORM DRAIN INLETS) <br /> Location Quantity <br /> CORTEZ AVENUE (7 Locations) 134 S.Y. Location Quantity <br /> CORTEZ AVENUE SEVILLE AVENUE (1 Locations) 4 S.Y. CORTEZ AVE/BALBOA AVE <br /> Sta. 3+09 to Sta. 3+34 204 S.Y. BARCELONA AVENUE (1 Locations) 4 S.Y. NE Corner (ADA Ramp) 1 Each <br /> Int. Portola Ave. 83 S.Y. <br /> Sta. 15+85 to Sta. 16+10 205 S.Y. PALOMA AVENUE (21 Locations) 254 S.Y. SE Corner (ADA Ramp) 1 Each <br /> Planing Along Gutter 1,764 S.Y. VALENCIA AVENUE (8 Locations) 325 S.Y. CORTEZ AVE/DE ANZA AVE <br /> SEVILLE AVENUE DE ANZA AVENUE (2 Locations) 78 S.Y. SW Corner (ADA Ramp) 1 Each <br /> Sta. 0+09 to Sta. 0+34 204 S.Y. TOTAL 799 S.Y. NW Corner (ADA Ramp) 1 Each <br /> Planing Along Gutter 1,427 S.Y. SEVILLE AVE/BALBOA AVE <br /> BARCELONA AVENUE NE Corner (ADA Ramp) 1 Each <br /> Sta. 0+09 to Sta. 0+34 204 S.Y. ADJUST FRAMES AND COVERS BARCELONA AVE/DE ANZA AVE <br /> Sta. 14+03 to Sta. 14+28 87 S.Y. <br /> Sta. 15+08 to Sta. 15+33 87 S.Y. Location Quantity NW Corner (ADA Ramp) 1 Each <br /> Sta. 17+79 to Sta. 18+19 186 S.Y. NE Corner (ADA Ramp) 1 Each <br /> o Planing Along Gutter 1,914 S.Y. MAINTENANCE HOLES TOTAL 7 Each <br /> CA PALOMA AVENUE CORTEZ AVENUE <br /> D Sta. 19+36 to Sta. 19+61 204 S.Y. Sta. 14+11± (CL) 1 Each <br /> 0 o Sta. 33+33 to Sta. 33+58 87 S.Y. CAPISTRANO AVENUE RETROFIT DETECTABLE WARNING <br /> Sta. 34+38 to Sta. 34+63 87 S.Y. Sta. 01+76± (CL) 1 Each <br /> o m Sta. 39+27 to Sta. 39+52 205 S.Y. Sta. 05+26f (CL) 1 Each SURFACE (TRUNCATED DOMES) <br /> = z Planing Along Gutter 2,342 S.Y. Sta. 08+75f (CL) 1 Each <br /> D m VALENCIA AVENUE DE ANZA AVENUE Location Quantity <br /> Sta. 0+09 to Sta. 0+34 204 S.Y. Sta. 00+30t (CL) 1 Each <br /> N <br /> Sta. 14+03 to Sta. 14+28 87 S.Y. Sta. 01+70± (CL) 1 Each SEVILLE AVE/DE ANZA AVE <br /> N <br /> Sta. 15+08 to Sta. 15+33 87 S.Y. Sta. 03+39f (CL) 1 Each SW Corner (Existing ADA Ramp) 1 Each <br /> 3 Sta. 22+15 to Sta. 22+40 83 S.Y. PALOMA AVENUE NW Corner (Existing ADA Ramp) 1 Each <br /> n Sta. 23+40 to Sta. 23+65 83 S.Y. Sta. 26+58t (CL) 1 Each BARCELONA AVE/BALBOA AVE <br /> Sta. 26+75 to Sta. 27+00 83 S.Y. Sta. 30+29f CL 1 Each SE Corner (Existing ADA Ramp) 1 Each <br /> .. Planing Along Gutter 2,950 S.Y. WATER VALVES <br /> NE Corner (Existing ADA Ramp) 1 Each <br /> CAPISTRANO AVENUE CORTEZ AVENUE BALBOA AVE <br /> Sta. 0+09 to Sta. 0+34 204 S.Y. Sta. 14+00± 26'(Lt.) 1 Each PALOMA AVE/ <br /> Planing Along Gutter 1,332 S.Y. BARCELONA AVENUE SE Corner (Existing ADA Ramp) 1 Each <br /> DE ANZA AVENUE Sta. 14+26f 11'(Lt.) 1 Each NE Corner (Existing ADA Ramp) 1 Each <br /> o Planing Along Gutter 787 S.Y. PALOMA AVENUE DE ANZA AVENUE <br /> D Sta. 19+55t 23'(Lt.) 1 Each Sta. 03+67 (Rt.) 1 Each <br /> TOTAL 15,190 S.Y. <br /> � TOTAL 12 Each TOTAL 7 Each <br /> M <br /> rn <br /> z <br /> 0 <br /> COUNTY OF SAN JOAQUIN NO SCALE SUMMARY OF QUANTITIES COLONIAL HEIGHTS RESURFACING PHASE 1 Sheet No. <br /> (Various) 18 of 20 <br /> DRAWN BY DATE I PROJECT ENGINEER DATE CH CKED DATE APPROVAL RECOMMENDED DATE <br /> Enrique Silva 06/06 AG 44 `h- o <br />
The URL can be used to link to this page
Your browser does not support the video tag.