Laserfiche WebLink
ASPHALT CONCRETE (TYPE B) PLACE ASPHALT CONCRETE MINOR CONCRETE <br /> MISCELLANEOUS AREAS (CURB, GUTTER & SIDEWALK) <br /> Location Quantity Locations Quantity Locations Quantity <br /> CORTEZ AVENUE CORTEZ AVE CORTEZ AVE <br /> Main Line 494 Tons Sta. 10+89 to Sta. 11+01 Rt.) 1.33 SY Sta. 10+89 to Sta. 11+01 Rt.) 12 LF <br /> Pavement Repair 45 Tons Sta. 13+28 to Sta. 13+36 Rt. 0.88 SY Sta. 13+28 to Sta. 13+36 Rt. 8 LF <br /> Misc. Areas 9 Tons Sta. 14+98 to Sta. 15+10 Lt.) 1.33 SY Sta. 14+98 to Sta. 15+10 Lt.) 12 LF <br /> CORTEZ AVE(ADA <br /> BALBOA AVE CORTEZ AVE BALBOA AVE <br /> SEVILLE AVENUE NE Corner DA Ramp) 2.05 SY NE Corner ADA Ramp) 18.5 LF <br /> Main Line 382 Tons SE Corner Ramp) 2.17 SY SE Corner ADA Ramp) 19.6 LF <br /> Pavement Repair 2 Tons CORTEZ AVE DE ANZA AVE CORTEZ AVE/DE ANZA AVE <br /> Misc. Areas 3 Tons SW Corner ADA Ramp? 2.97 SY SW Corner (ADA Ramp) 26.8 LF <br /> NW Corner ADA Ramp3.36 SY NW Corner (ADA Ramp) 30.3 LF <br /> BARCELONA AVENUE SE Corner ADA Ramp 4.11 SY SE Corner ADA Ramp) 37 LF <br /> Main Line 602 Tons NE Corner (ADA Ramp) 2.11 SY NE Corner ADA Ramp) 19 LF <br /> o Pavement Repair 2 Tons CORTEZ AVE/THORNTON ROAD CORTEZ AVE/THORNTON ROAD <br /> Misc. Areas 5 Tons SW Corner ADA Ram 2.22 SY SW Corner ADA Ram 20 LF <br /> o NW Corner ADA Ramp) 4.77 SY NW Corner ADA Ramp 43 LF <br /> PALOMA AVENUE SEVILLE AVE SEVILLE AVE <br /> n Main Line 667 Tons Sta. 9+75 to Sta. 9+83 (Rt.) 0.88 SY Sta. 9+75 to Sta. 9+83 (Rt.) 8 LF <br /> 0 o Pavement Repair 85 Tons Sta. 9+99 to Sta. 10+19 (Rt.) 2.22 SY Sta. 9+99 to Sta. 10+19 Rt. 20 LF <br /> Misc. Areas 0 Tonsa. <br /> SEVILLE AVE BALBOA AVE SEVILLE AVE BAL30A AVE <br /> . = Z SE Corner ADA Ramp 3.03 SY SE Corner ADA Ramp 27.3 LF <br /> D ; VALENCIA AVENUE NE Corner ADA Ramp) 3.93 SY NE Corner ADA Ramp) 35.4 LF <br /> M Main Line 819 Tons BARCELONA AVE/CAPISTRANO AVE BARCELONA AVE/CAPISTRANO AVE <br /> Pavement Repair 108 Tons SW Corner (ADA Ramp) 2.00 SY SW Corner (ADA Ramp) 18 LF <br /> N Misc. Areas 0 Tons SE Corner (ADA Ramp) 2.21 SY SE Corner (ADA Ramp) 19.9 LF <br /> C Sta. 7+11 (Lt.) ADA Ramp 2.66 SY Sta. 7+11 (Lt.) ADA Ramp 24 LF <br /> rBARCELONA AVE/DE ANZA AVE BARCELONA AVE/DE ANZA AVE <br /> O CAPISTRANO AVENUE <br /> Main Line 363 Tons NW Corner (ADA Ramp) 2.68 SY ( p) 24.2 LF <br /> Pavement Repair 0 Tons NE Corner ((ADA Ramp) NW Corner Ram <br /> 3.42 SY NE Corner (ADA Ramp) 30.8 LF <br /> Misc. Areas 0 Tons Sta. 11+41 (Rt.) ADA Ramp 2.82 SY Sta. 11+41 (Rt.) ADA Ramp 24.5 LF <br /> BARCELONA AVE/THORNTON ROAD BARCELONA AVE/THORNTON ROAD <br /> DE ANZA AVENUE SW Corner (ADA Ramp) 2.25 SY SW Corner (ADA Ramp) 20.3 LF <br /> N Main Line 218 Tons NW Corner (ADA Ramp) 2.61 SY NW Corner (ADA Ramp) 23.5 LF <br /> Pavement Repair 26 Tons DE ANZA AVE DE ANZA AVE <br /> o Misc. Areas 3 Tons Sta. 0+58 to Sta. 0+62 (Lt.) .44 SY Sta. 0+58 to Sta. 0+62 (Lt.) 4 LF <br /> Sta. 1+45.5 to Sta. 1+49.5 (Lt.) .44 SY Sta. 1+45.5 to Sta. 1+49.5 (Lt.) 4 LF <br /> rn <br /> TOTAL 3,833 Tons Sta. 1+62 to Sta. 1+74 (Lt.) 1.33 SY Sta. 1+62 to Sta. 1+74 (Lt.) 12 LF <br /> m TOTAL 60.22 SY TOTAL 542 LF <br /> z <br /> 0 <br /> COUNTY OF SAN JOAQUIN NO SCALE SUMMARY OF QUANTITIES COLONIAL HEIGHTS RESURFACING PHASE 1 Sheet No. <br /> (Various) 19 of 20 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CH CKED I DATE APPROVAL RECOMMENDED DATE <br /> Enrique Silva 06/06 <br />