My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP4593 - SP4600
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP4146 - SP4609
>
SP4593 - SP4600
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 8:22:38 AM
Creation date
1/23/2016 1:15:02 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Colonial Heights Resurfacing, Phase 5
Limits
Alcazar Way, Arroyo Way, El Camino Avenue, Heather Drive, Paloma Avenue, San Diego Way and San Pablo Way
Year
2008
Project Engineer
Toshiro Sessoms
Roads Worked
Alcazar Wy., Arroyo Wy., El Camino Ave., Heather Dr.
Paloma Ave., San Diego Wy., San Pablo Wy.
Red Lines
No
Supplemental fields
Cross Ref
SP4593 - SP4600
DocCategory
Improvement Plans
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PAVEMENT REPAIR PLANING ASPHALT ADJUST FRAMES AND COVERS RETROFIT CURB RAMP <br /> Location Quantity CONCRETE PAVEMENT (continued) DETECTABLE WARNING SURFACE <br /> ARROYO WAY (continued) Location Quanti <br /> tY Location Quantity <br /> Location Quantity(2 Locations) 11 SY SANITARY SEWES MAINTENANCE HOLES ALCAZAR WAY/SAN PABLO WAY <br /> ARROYO WAY NE Corner (Existing ADA Romp) 1 Each <br /> EL CAMINO AVENUE PALOMA AVENUE Sto 15+29 (11' LT) 1 Each NW Corner (Existing ADA Ramp) 1 Each <br /> (2 Locations) 19 SY Conform Sto 18+92 (11' LT) 1 Each SW Corner (Existing ADA Ramp) 1 Each <br /> Sto 12+35 to Sto 12+50 53 SY <br /> PALOMA AVENUE Planing EL CAMINO AVENUE PALOMA AVENUE/ARROYO. WAY <br /> (1 Location) 5 SY Sto 12+50 to Sto 28+58 2,451 SY Sto 10+07 1' RT 1 Each <br /> Conform ( ) NE Corner (Existing ADA Ramp). 1 Each <br /> SAN DIEGO WAY Sto 28+58 to Sto 28+73 50 SY Sto 10+30 (1' RT) 1 Each NW Corner (Existing ADA Ramp) 1 Each <br /> (1 Location) 55 SY Sto 11 +32 (2' RT) 1 Each SW Corner (Existing ADA Ramp) 1 Each <br /> SAN DIEGO WAY SE Corner (Existing ADA Ramp) 1 Each <br /> SAN PABLO WAY Planing PALOMA AVENUE <br /> (1 Location) 2 SY Sto 10+16 to Sto 16+84 643 SY Sto 22+15 (2' RT) 1 Each PALOMA AVENUE/SAN DIEGO WAY <br /> NE Corner (Existing ADA Ramp) 1 Each <br /> SAN PABLO WAY <br /> TOTAL 92 SY SAN PABLO WAY SW Corner (Existing ADA Romp) 1 Each <br /> Conform Sto 11 +83 (11" LT) 1 Each <br /> Sto 9+37 to Sto 9+52 50 SY SE Corner (Existing ADA Romp) 1 Each <br /> Planing PALOMA AVENUE/SAN PABLO WAY <br /> PLANING ASPHALT Sto 9+52 to Sto 12+86 ssa SY <br /> CONCRETE PAVEMENT Conform WATER VALVES NE Corner (Existing ADA Ramp) 1 Each <br /> sSto 12+86 to Sto 13+16 50 SY ARROYO WAY NW Corner (Existing ADA Ramp) 1 Each <br /> n Location Quantity Sto 18+00 (15' LT) 1 Each SW Corner (Existing ADA Ramp) 1 Each <br /> g ALCAZAR WAY TOTAL 6,844 SY SE Corner (Existing ADA Ramp) 1 Each <br /> F Planing PALOMA AVENUE <br /> z Sto 10+16 to Sto 18+41 769 SY Sto 22+25 (21' LT) 1 Each PALOMA AVENUE/SOLANO AVENUE <br /> ADJUST FRAMES AND COVERS Sto 22+30 (23' LT) 1 Each NE Corner (Existing ADA Ramp) 1 Each <br /> m ARROYO WAY NW Corner (Existing ADA Ramp) 1 Each <br /> Planing MONUMENTS (Existing Sto 10+16 to Sto 20+08 892 SY Location Quantity EL CAMINO AVENUE SW Corner ( 9 ADA Romp) 1 Each <br /> Conform STORM DRAIN MAINTENANCE HOLES Sto 10+00 (CL) 1 Each TOTAL 17 Each <br /> Sto 20+08 to Sto 20+23 53 SY ARROYO WAY <br /> EL CAMINO AVENUE Sto 19+37 (CL) 1 Each TOTAL 18 Each <br /> Conform EL CAMINO AVENUE <br /> Sto 9+70 to Sto 9+85 53 SY Sto 11 +45 (CL) 1 Each <br /> O Planing Sto 14+25 <br /> CL 1 Each <br /> Sto 9+85 to Sto 17+18 524 SY <br /> u <br /> Sto 16+93 (CL) 1 Each <br /> v HEATHER DRIVE PALOMA AVENUE <br /> o Conform 10'19+62 RT <br /> a Sto 9+54 to Sto 9+69 53 SY Sto ( ) 1 Each <br /> M Planing Sto 22+06 (3' RT) 1 Each <br /> ., Sto 9+69 to Sto 16+74 649 SY Sto 26+29 (CL) 1 Each <br /> m <br /> z (continued above) (continued above) <br /> 0 <br /> COUNTY OF SAN JOAQUIN NO SCALE SUMMARY OF QUANTITIES COLONIAL HEIGHTS RESURFACING, PHASE 5 Sheet No. <br /> (Mann W, MM WW a MW MOM MUKR DME WIDIM MIKE SVI Dino W•SM PIaD w 7 of 8 <br /> DRAWN DY DATE PROJECT ENGINEER DATE CHECKED DATE 7 APPROVAL RE OMMENDED DATE <br /> %a/,.Lea�r000mo� If�li�o( TosNIIL� S6ss- '� iIto for 1144 f7&MAl <br />
The URL can be used to link to this page
Your browser does not support the video tag.