My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP4593 - SP4600
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP4146 - SP4609
>
SP4593 - SP4600
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 8:22:38 AM
Creation date
1/23/2016 1:15:02 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Colonial Heights Resurfacing, Phase 5
Limits
Alcazar Way, Arroyo Way, El Camino Avenue, Heather Drive, Paloma Avenue, San Diego Way and San Pablo Way
Year
2008
Project Engineer
Toshiro Sessoms
Roads Worked
Alcazar Wy., Arroyo Wy., El Camino Ave., Heather Dr.
Paloma Ave., San Diego Wy., San Pablo Wy.
Red Lines
No
Supplemental fields
Cross Ref
SP4593 - SP4600
DocCategory
Improvement Plans
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REMOVE THERMOPLASTIC REMOVE THERMOPLASTIC PAVEMENT REINFORCING FABRIC MINOR CONCRETE <br /> PAVEMENT MARKINGS PAVEMENT MARKINGS (continued) Location Quantity (CURB, GUTTER & SIDEWALK) <br /> Location Quantity Location Quantity ALCAZAR WAY Location Quantity <br /> ALCAZAR WAY/SAN PABLO WAY PALOMA AVE/SAN PABLO WAY Sto 10+16 to Sto 18+41 2,330 SY ALGAZAR WAY <br /> STOP BAR (WHITE) 61 SF 4 STOP LEGENDS (WHITE) 88 SF ARROYO WAY Sto 11 +71 to Sto 11 +75 (RT) 4 LF <br /> Sto 14+79 to Sto 14+91 (RT) 12 LF <br /> Sto 10+16 to Sto 19+93 2,870 SY <br /> ALCAZAR WAY/ARROYO WAY SAN PABLO WAY Sto 16+24 to Sto 16+36 (RT) 12 LF <br /> STOP BAR (WHITE) 51 SF SCHOOL LEGEND (YELLOW) 35 SF EL CAMINO AVENUE Sto 18+11 to Sto 18+43 (LT) 32 LF <br /> ARROYO WAY/EL CAMINO AVE TOTAL 1,658 SF Sto 10+00 to Sto 17+18 1 ,957 SY EL CAMINO AVENUE <br /> STOP BAR (WHITE) 51 SF HEATHER DRIVE Sto 9+93 to Sto 10+25 (RT) 32 LF <br /> Sto 9+69 to Sto 16+74 1 ,994 SY $to 10+04 to Sto 10+25 (LT) 21 LF <br /> EL CAMINO AVE/HEATHER DR ASPHALT CONCRETE (TYPE B) Sto 14+79 to Sto 14+98 (LT) 19 LF <br /> STOP BAR (WHITE) 73 SFLocation Quantity PASttaa 12+65 to Sto 28+43 2,761 SY PALOMA AVENUE <br /> PALOMA AVE/ARROYO WAY ALCAZAR WAY Sto 24+06 to Sto 24+26 (LT) 20 LF <br /> CROSSWALK (WHITE) 448 SF Mainline 264 Tons SAN DIEGO WAY Sto 24+75 to Sto 25+41 (LT) 66 LF <br /> Planing Area 64 Tons Sto 10+16 to Sto 16+84 1 ,986 SY Sto 27+54 to Sto 27+59 (RT) 5 LF <br /> PALOMA AVE/HEATHER DR ARROYO WAY SAN PABLO WAY Sto 27+73 to Sto 27+78 (RT) 5 LF <br /> CROSSWALK (YELLOW) 246 SF Mainline 325 Tons Sto 9+52 to Sto 12+86 696 SY <br /> SAN DIEGO WAY <br /> PALOMA PABLO WAY AVE SAN Planing Area 79 Tons <br /> / Sto 11 +27 to Sto 11 +31 (RT) 4 LF <br /> CROSSWALK (WHITE) 350 SF EL CAMINO AVENUE TOTAL 14,594 SY Sto 11 +66 to Sto 11 +86 (RT) 20 LF <br /> ALCAZAR WAY/SAN PABLO WAY Mainline 222 Tons Planing Area 48 Tons SAN PABLO WAY <br /> m 1 STOP LEGEND (WHITE) 22 SF Sto 12+28 to Sto 12+48 (RT) 20 LF <br /> z HEATHER DRIVE Sto 12+79 to Sto 12+83 (RT) 4 LF <br /> m ALCAZAR WAY/ARROYO WAY Mainline 226 Tons <br /> 1 STOP LEGEND (WHITE) 22 SF Planing Area 59 Tons TOTAL 276 LF <br /> ARROYO WAY/EL CAMINO AVE PALOMA AVENUE <br /> 1 STOP LEGEND (WHITE) 22 SF Mainline ® 0.17' 206 Tons <br /> Planing Area 213 Tons <br /> EL CAMINO AVE/HEATHER DR Mainline ® 0.12' 68 Tons <br /> 2 STOP LEGENDS (WHITE) 44 SF Transition 9 Tons <br /> PALOMA AVE/ARROYO WAY SAN DIEGO WAY <br /> 4 STOP LEGENDS (WHITE) 88 SF Mainline 225 TonsPlaning Area 54 Tons <br /> PALOMA AVE <br /> U s SCHOOL LEGEND (YELLOW) 35 SF sAN Mainline linePABWAY 82 Tons <br /> Iwo <br /> n PALOMA AVE/HEATHER DR Planing Area 52 .Tons <br /> W m STOP LEGEND (WHITE) 22 SF Pavement Repair (Total) 31 Tons <br /> o (continued above) AC (Miscellaneous Areas) 10 Tons <br /> TOTAL 2,237 Tons <br /> COUNTY OF SAN JOAQUIN NO SCALE SUMMARY OF QUANTITIES COLONIAL HEIGHTS RESURFACING, PHASE 5 Sheet No. <br /> KWM W,, rwma wW, a.aro*MX WMIN oaf FRIM AGIM sw MW we'a sw FReo wet 8 of 8 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECK D DATE APPROVA R�C/O�MMENDED 'DATE <br /> .JoalcLza �eaoarne� f��li�°Y ? IR.e Se S3•�„3 t1�1)�oY /�' � //�/.T/n ROIL 7�'T�? <br />
The URL can be used to link to this page
Your browser does not support the video tag.