Laserfiche WebLink
Conform at Existing Expansion Joint or <br /> Saw Cul and Conform at Existing Weakened <br /> Plane Joint or Score Mork (Typical) <br /> i� 4.0' (Min.) Retaining Curb <br /> li - as necessary <br /> I�� Place Truncated DomesSeeRome Lip oem�r sneer s <br /> li at Curb Ramp per 5� / �2� <br /> f R.S.P. A88A (Typical) <br /> y i • <br /> (Typical) Pg g y � � <br /> be relocated b others ( 1 ` <br /> Existing retaining wall 6^f <br /> Existing Stop Sign to \ 1 ac <br /> 0 <br /> 1 _ <br /> Existing Fire Hydrant v ro 1 r `� / to remain in place <br /> & Water Valve to �' \i `�u,� qA� Saw cul existing sidewalk <br /> remain in place ty "' ea o�, along face of wall prior — <br /> T+ ''.1 1 �� M to removal of sidewalk <br /> I Front Edge of Sidewalk • �. 1 — — — — <br /> .h A A <br /> (Flowline) R = 16.5• <br /> 4.0� 2�� � - <br /> " `L <br /> � a C o <br /> 5 2' <br /> R & D Exist. CG&S g.33 27 <br /> Front Edge of Sidewalk Install New CG&S <br /> (Flowline) R = 7.0' (Typical) <br /> TUXEDO AVE - <br /> -3.5• <br /> N1_�_ <br /> Front Edge of sidewalk - L <br /> 10.5' (Flowline) R = 16.0• 11'8 ' 4" (Mi2)C toa <br /> Aggregate <br /> Bs <br /> SECTION B-B minimum <br /> F n 1• C relative compaction of 90%. <br /> S o (Typical) <br /> T <br /> — — — — Adjust Existing SDI to — — <br /> m = _ _ = Final FL Grade (Typical) <br /> Max. �o v7 0' <br /> v <br /> A m 1 (Max.) <br /> 0 4.0• ��" a K <br /> Place 3' CG&S <br /> Transition (Typical) 1 II N y �d �, - 8.0•i __Retaining Curb <br /> II as necessary <br /> Front Edge of Sidewalk I \ Z -' <br /> j (Flowline) R = 10.0' i ���'_ �� (Typical) <br /> I IIS Existing Top of Curb <br /> M F Existing Flowline <br /> �V i Existing Boulders 2.5' 4.0• <br /> Existing Water Valve _ to remain in place Var. � I - �1 0' <br /> to remain in place —I rVar. <br /> (TYpicol) .. itOx <br /> N <br /> TUXEDO AVE/MISSION AVE 3.5 <br /> f SECTION C-C <br /> A <br /> T <br /> (•1 <br /> Z <br /> COUNTY OF SAN JOAQ UIN NO SCALE SPECIAL RAMP DETAILS CENTRAL STOCKTON Sheet No. <br /> ACCESSIBILITY IMPROVEMENTS 14 of 24 <br /> DRAWN BY DATE PROJECT NGINEER DATE CHECKED IDATE I APPROVAL RECOMMENDED DATE <br />