Laserfiche WebLink
PLANING ASPHALT DRIVEWAYS (TYPE E) PAVEMENT REINFORCING FABRIC <br /> CONCRETE PAVEMENT Location Quantity Location Quantity <br /> Location Quantity 42 Locations 1,382 SY Sta 452+15 to Sta 630+38 47,528 SY <br /> Beginning of Project Total 1 ,382 SY <br /> Sta 451+90 to Sto 452+15 99 SY Total 47,528 SY <br /> North Ripon Road Intersection 87 SY PENETRATION TREATMENT <br /> Tide Road Intersection 81 SY Location Quantity PLACE MONUMENT <br /> North Ripon Road 172 SY <br /> FRAMES AND COVERS <br /> Due Road Intersection 69 SY Tide Road 149 SY Location Quantity <br /> Due Road 163 SY <br /> Murphy Road (North and South) Sto 452+47 CL 1 Each <br /> Murphy Road North Intersection 64 SY 301 SY Sta 465+05 CL 1 Each <br /> Sta 470+05 CL 1 Each <br /> Murphy Road South Intersection 35 SY I Total 785 SY Sta 479+16 CL 1 Each <br /> Sto 484+16 CL 1 Each <br /> Stu 514+11 CL 1 Each <br /> End of Project ASPHALT CONCRETE (TYPE A) sig 5149+20 cE 1 Each <br /> Sta 630+38 to Sta 630+63 89 SY Sta 583+51 CL 1 Each <br /> Location Quantity Sta 592+08 CL i Each <br /> y Total 504 SY Sta 610+97 CL 1 Each <br /> o- Mainline Sto 615+97 CL 1 Each <br /> Sta 452+40 to Sta 630+13 10,694 Tons Sta 629+31 CL 1 Each <br /> m <br /> z Transition Areas French Camp Road <br /> m SHOUI-DER BACKING <br /> Sta 451+90 to Stu4sz+4o 23 Tans rami 3 Each <br /> Location Quantity Sto 630+13 to Sto 630+63 21 Tons <br /> Sto 451+90 to Sta 630+63 3,264 Tons Intersection Transition Areas <br /> North Ripon Road 32 Tons <br /> Total 3,264 Tons Tide Road 21 Tons <br /> Due Road 28 Tons <br /> Murphy Road North 7 Tons <br /> Murphy Road South 14 Tons 31�P D Mq <br /> DRIVEWAYS (TYPE D) Driveways (Types D & E) 199 Tons z No. 38185 <br /> ra <br /> Location Quantity <br /> Total 11,039 Tons 9�. cry1L o <br /> 0 <br /> 6 Locations 191 SY a CK�f <br /> m Total 191 SY <br /> m <br /> OZ Peter D. ]Martin <br /> RCE 38465 <br /> COUNTY OF SAN JOAQUINNo SCALE SUMMARY OF QUANTITIES FRENCH CAMP ROAD RESURFACING Sheet No. <br /> (Jack Tone Road to State highway Route 120) 5 of 5 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE APPROVAL REC MMENDED DATE <br /> r, n ...,�.J_..f ..moi,... .• / �• /J _ . _ n n � .. _. .� • • . <br />