My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP4682 - SP4687
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP4710 - SP6054
>
SP4682 - SP4687
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 1:21:20 PM
Creation date
1/23/2016 1:17:28 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Rubberized Chip Seal
Limits
Road District 1 - Airport Way, Howard Road and French Camp Road Road District 2 - Mariposa Road Road District 3 - Airport Way, Howard Road and Lovelace Road Road District 4 - Eight Mile Road, Liberty Road, Lower Sacramento Road and West Lane Road District 5 - Airport Way, and Eleventh Street
Year
2009
Project Engineer
Tim Callahan
Roads Worked
Airport Wy., Howard Rd., French Camp Rd., Mariposa Rd.
Lovelace Rd., Eight Mile Rd., Liberty Rd.
Lower Sacramento Rd., West Ln., Eleventh St.
Red Lines
No
Federal #
ESPL-5929 (200)
Supplemental fields
Cross Ref
SP4682 - SP4687
DocCategory
Improvement Plans
Type
Rubberized Chip Seal
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PAVEMENT REPAIR ASPHALT CONCRETE (TYPE B) <br /> Location Number Quantities Pavement Repair Locations Quantities <br /> Road District 1 Road District 1 <br /> Airport Way (French Camp to 6300' N.) 2 47 S.Y. Airport Way (French Camp to 6300' N.) 16 Tons <br /> French Camp Road (EI Dorado to 2680' W.) 4 145 S.Y. French Camp Road (EI Dorado to 2680' W.) 48 Tons <br /> (Ad. Bid Alt. B) (Ad. Bid Alt. B) <br /> Road District 2 Road District 2 <br /> Mariposa Road 1100 w/o Carpenter Rd. to 9 60 S.Y. Mariposa Road 1100 w/o Carpenter Rd. to 20 Tons <br /> 6020' w/o Austin Rd.) 6020' w/o Austin Rd.) <br /> Road District 3 Road District 3 <br /> Airport Way 2600 n o Lathrop Rd. to 1 1 S.Y. Airport Way 2600 n o Lathrop Rd. to 1 Tons <br /> 930' s/o Roth Rd.) 930' s/o Roth Rd.) <br /> Lovelace Road (Airport Way to Union Rd.) 3 35 S.Y. Lovelace Road (Airport Way to Union Rd.) 11 Tons <br /> (Ad. Bid Alt. C) (Ad. Bid Alt. C) <br /> Road District 4 Road District 4 <br /> Eight Mile Road (Union Pacific Railroad to 900' W.) 1 50 S.Y. Eight Mile Road (Union Pacific Railroad to 900' W.) 17 Tons <br /> Eight Mile Road (Lower Sacramento Rd to Pearson Rd.) 1 120 S.Y. Eight Mile Road (Lower Sacramento Rd to Pearson Rd.) 40 Tons <br /> Road District 5 Road District 5 <br /> Eleventh Street (2875' w/o Chrisman Rd. to 8 122 S.Y. Eleventh Street (2875 w/o Chrisman Rd. to 41 Tons <br /> 1685' W/o Banta Rd.) 1685' w/o Banta Rd.) <br /> (Ad. Bid Alt. A) (Ad. Bid Alt. A) <br /> Eleventh Street (Lovely Rd. to 1-5) 1 1 S.Y. <br /> Total 194 Tons <br /> 581 S.Y. <br /> 0 <br /> RUBBERIZED CHIP SEAL <br /> �iorESSlpt <br /> Location Quantities <br /> Road District 1 99,995 S.Y. <br /> � o. 42 1 Road District 2 19,769 S.Y. <br /> v, * Exp- 3-31-10 * Road District 3 108,824 S.Y. <br /> Road District 4 160,946 S.Y. <br /> 9lF QF yCPRoad District 5 225,692 S.Y. <br /> a Total 615,227 S.Y. <br /> 0 <br /> COUNTY OF SAN JOAQUIN NO SCALE SUMMARY OF QUANTITIES Rubberized Chip Seal Sheet Na. <br /> (Road Districts 1 , 2, 3, 4, and 5) 6 of 6 <br /> DRAWN BY DATE PROJECT <br /> ENGINEER DATE CHECKED LDATE APPROVAL RECOMMENDED DATE <br /> Tim Callahan 05/09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.