Laserfiche WebLink
PAVEMENT REPAIR ASPHALT CONCRETE (TYPE B) <br /> Location Number Quantities Pavement Repair Locations Quantities <br /> Road District 1 Road District 1 <br /> Airport Way (French Camp to 6300' N.) 2 47 S.Y. Airport Way (French Camp to 6300' N.) 16 Tons <br /> French Camp Road (EI Dorado to 2680' W.) 4 145 S.Y. French Camp Road (EI Dorado to 2680' W.) 48 Tons <br /> (Ad. Bid Alt. B) (Ad. Bid Alt. B) <br /> Road District 2 Road District 2 <br /> Mariposa Road 1100 w/o Carpenter Rd. to 9 60 S.Y. Mariposa Road 1100 w/o Carpenter Rd. to 20 Tons <br /> 6020' w/o Austin Rd.) 6020' w/o Austin Rd.) <br /> Road District 3 Road District 3 <br /> Airport Way 2600 n o Lathrop Rd. to 1 1 S.Y. Airport Way 2600 n o Lathrop Rd. to 1 Tons <br /> 930' s/o Roth Rd.) 930' s/o Roth Rd.) <br /> Lovelace Road (Airport Way to Union Rd.) 3 35 S.Y. Lovelace Road (Airport Way to Union Rd.) 11 Tons <br /> (Ad. Bid Alt. C) (Ad. Bid Alt. C) <br /> Road District 4 Road District 4 <br /> Eight Mile Road (Union Pacific Railroad to 900' W.) 1 50 S.Y. Eight Mile Road (Union Pacific Railroad to 900' W.) 17 Tons <br /> Eight Mile Road (Lower Sacramento Rd to Pearson Rd.) 1 120 S.Y. Eight Mile Road (Lower Sacramento Rd to Pearson Rd.) 40 Tons <br /> Road District 5 Road District 5 <br /> Eleventh Street (2875' w/o Chrisman Rd. to 8 122 S.Y. Eleventh Street (2875 w/o Chrisman Rd. to 41 Tons <br /> 1685' W/o Banta Rd.) 1685' w/o Banta Rd.) <br /> (Ad. Bid Alt. A) (Ad. Bid Alt. A) <br /> Eleventh Street (Lovely Rd. to 1-5) 1 1 S.Y. <br /> Total 194 Tons <br /> 581 S.Y. <br /> 0 <br /> RUBBERIZED CHIP SEAL <br /> �iorESSlpt <br /> Location Quantities <br /> Road District 1 99,995 S.Y. <br /> � o. 42 1 Road District 2 19,769 S.Y. <br /> v, * Exp- 3-31-10 * Road District 3 108,824 S.Y. <br /> Road District 4 160,946 S.Y. <br /> 9lF QF yCPRoad District 5 225,692 S.Y. <br /> a Total 615,227 S.Y. <br /> 0 <br /> COUNTY OF SAN JOAQUIN NO SCALE SUMMARY OF QUANTITIES Rubberized Chip Seal Sheet Na. <br /> (Road Districts 1 , 2, 3, 4, and 5) 6 of 6 <br /> DRAWN BY DATE PROJECT <br /> ENGINEER DATE CHECKED LDATE APPROVAL RECOMMENDED DATE <br /> Tim Callahan 05/09 <br />