STREET NAME LIMITS LENGTH AREA
<br /> Road District 1
<br /> Airport Way French Camp Rd. to 6300' N. 6,300' 49,700 S.Y.
<br /> Howard , Road San JoacLuln River to Matthews Rd. 11,000' 39,111 S.Y.
<br /> French Camp RogQ_ Ad_.d,id_At_. I r t. to 680 W _._._ _. 2680 ________11_lg4 �.Y.__,.__,
<br /> District 1 Total 19,980' 99,995 S.Y.
<br /> Road District 2
<br /> Mariposa Road 1100' w/o Carpenter Rd to 6020' wLo Austin Rd. 5,560' 19 769 S.Y.
<br /> District 2 Total 5,560' 19,769 S.Y.
<br /> Road District 3
<br /> Airport_Way _.,___2600' n/o Lathrop Rd. to 930' s/o Roth Rd_ - - _ _ 7100' 26,033 S.Y.
<br /> Howard Road 1520' w/o Undine Rd. to Wing Levee Rd, Roberts Rd to
<br /> San Joaquin River 19,160' 68124 S.Y.
<br /> Lovelace Road(Ad., Bd1 Alt_ C) Airport Way to Union Rd. _ _ _ ___ - _ 5,280__ __ 14667 S.Y.
<br /> District 3 Total 31 ,540 108,824 S.Y.
<br /> > Road District 4
<br /> 0
<br /> Eight Mlle Road 1-5 to 3060' E. WB Lanes only,
<br /> „_,,..,_,.______ Lower Sacramento Rd to Leach_R_d,___,__,,,,,,, 10500' 35293 S_Y_
<br /> Liberty Road (Ad. Bid Alt D_ .,_._Hwy 88 to 2.92 mi. E. _,_______—- _ 15,430' 51 433 S.Y.
<br /> Lower Sacramento Road __ .--,Pixley Slough to 2 950' n/o Armstro _ Rd - 12,660' 39 387 S.Y.
<br /> _ ng
<br /> West_L_ane _ Bear Creek_ to Eight Mile Rd. _..,..._,_ 9 500' 34 833 S.Y. _
<br /> Road District 5 District 4 Total 48,090' 160,946 S.Y.
<br /> Airport Way ....._.__- -- Woodward Rd. to 200' s/o_Trahern Rd, _ __ 28030' __ _ _.___99662 S:Y,,,____
<br /> _ Eleventh Street (Ad. Bid Alt_A�_ .___2875' 85 B
<br /> w/o Chrisman Rd. to 16w7o_ anta Rd_ 6470' 43,852 S.Y. _
<br /> Eleventh Street Lovely Rd. to 1-5 - 20620' - - - _ 82-178-S.Y.
<br /> District 5 Total 55,120' 225,692 S.Y. N oFE N/q1�F
<br /> GRAND TOTAL 160,290' 615,227 S.Y. r
<br /> No. 42581
<br /> ♦ Exp. 3-31-1
<br /> Note: The S.Y. quantities shown include all cul-de-sacs and intersection radii. 914, C1V1L ��?P
<br /> OF CP E
<br /> Z
<br /> COUNTY OF SAN JOA UIN NO SCALE SUMMARY OF QUANTITIES Rubberized Chip Seal Sheet No.
<br /> Q (Road Districts 1, 2, 3, 4, and 5) 5 of 6
<br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE APPROVAL RECOMMENDED DATE
<br />
|