My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP4790 - SP4803
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP4710 - SP6054
>
SP4790 - SP4803
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 3:24:20 PM
Creation date
1/23/2016 1:20:29 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Alpine Heights & Gianone Park Area Resurfacing
Limits
Belvedere Avenue: Alpine Avenue to North End Euclid Avenue: Sanguinetti Lane to Belvedere Avenue Golden Gate Avenue: Harding Way to Waterloo Road Harding Way: E Street to Filbert Street Higgins Avenue: Stadium Drive to Belvedere Avenue Stadium Drive: Sanguinetti Lane to Higgins Avenue Vine Street: D Street to Filbert Street
Year
2010
Project Engineer
L. Aguilar
Roads Worked
Belvedere Ave., Euclid Ave., Golden Gate Ave., Harding Wy.
Higgins Ave., Stadium Dr., Vine St.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP4790 - SP4803
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EARTHWORK (MISCELLANEOUS AREAS) DRIVEWAY (TYPE D) ASPHALT CONCRETE (TYPE B) <br /> Location Quantity Location Quantity Location Quantity <br /> Glanone Park Are Alpine Heights Alpine Heights <br /> Golden Gate Avenue Belvedere Avenue Belvedere Avenue <br /> Various Locations Throughout 17.45 Sta 7 Locations 51 SQYD Mainline Resurfacing 172 Tons <br /> Harding WaXGlanone Pork Area Pavement Repair 99 Tons <br /> Various Locations Throughout 1 .05 Sta Intersections 10 Tons <br /> t Harding Wav Driveways 12 Tons <br /> Vine Stree <br /> Various Locations Throughout 21.06 Sta 20 Locations 141 SQYD <br /> Vine Street Mainline lAResurfacing 390 Tons <br /> Total 39.56 Sta 7 Locations 61 SQYD Higgins Avenue <br /> Total 253 SQYD Mainline Resurfacing 210 Tons <br /> Pavement Repair 27 Tons <br /> DRIVEWAY (TYPE E) Stadium Drive <br /> Mainline Resurfacing 368 Tons <br /> Location Quantity Glanone Park Area <br /> N Alpine Heights Golden Gate Avenue <br /> Belvedere Avenue Mainline Resurfacing 835 Tons <br /> 2 Locations 33 SQYD Pavement Repair 191 Tons <br /> Intersections 64 Tons <br /> Glanone Park Area Driveways 2 Tons <br /> Golden Gate Avenue Harding Way <br /> n 3 Locations 23 SQYD Mainline Resurfacing 311 Tons <br /> n Harding •Wav Pavement Repair 200 Tons <br /> 8 Locations 132 SQYD Intersections 55 Tons <br /> SHOULDER BACKING Vine Street Driveways 37 Tons <br /> z 6 Locations 109 SQYD Vine Street <br /> m Mainline Resurfacing 484 Tons <br /> Location Quantity. Total 297 SQYD <br /> Pavement Repair 233 Tons <br /> ,Alvin�g is Intersections 11 Tons <br /> Belvedere Avenue PENETRATION TREATMENT Driveways 20 Tons <br /> Various Locations Throughout 21 Tons Total 3,731 Tons <br /> Location Quantity <br /> Glanone Park Area <br /> Golden Gate Avenue A1,v1ne Heights <br /> Various Locations Throughout 14 Tons Belvedere AvenueVarious Locations Throughout 111 SQYD <br /> Harding W= <br /> Various Locations Throughout 84 Tons Glanone Park Area <br /> o Vine Street Harding WW <br /> a Various Locations Throughout 82 Tons Various Locations Throughout 613 SQYD <br /> Total 201 Tons Total 724 SQYD <br /> rn <br /> z <br /> 9 Sheet No. <br /> COUNTY OF SAN JOAQUIN NO SCALE SUMMARY OF QUANTITIES ALPINE HEIGHTS & GIANONE PARK AREA RESURFACING 13 of 14 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE APPROVAL RECOMMENDED DATE <br /> -L. Aguilar 12110 • v It19.�10 �s�i /�/�//. <br />
The URL can be used to link to this page
Your browser does not support the video tag.