My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP4790 - SP4803
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP4710 - SP6054
>
SP4790 - SP4803
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 3:24:20 PM
Creation date
1/23/2016 1:20:29 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Alpine Heights & Gianone Park Area Resurfacing
Limits
Belvedere Avenue: Alpine Avenue to North End Euclid Avenue: Sanguinetti Lane to Belvedere Avenue Golden Gate Avenue: Harding Way to Waterloo Road Harding Way: E Street to Filbert Street Higgins Avenue: Stadium Drive to Belvedere Avenue Stadium Drive: Sanguinetti Lane to Higgins Avenue Vine Street: D Street to Filbert Street
Year
2010
Project Engineer
L. Aguilar
Roads Worked
Belvedere Ave., Euclid Ave., Golden Gate Ave., Harding Wy.
Higgins Ave., Stadium Dr., Vine St.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP4790 - SP4803
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PAVEMENT REINFORCING FABRIC MAINTENANCE HOLES (STORM DRAIN) 24 Inch Dia. FRAME AND COVER <br /> Location Quantity (TYPE 1) Location Quantity <br /> AI ine Heights Location Quantity <br /> i <br /> P �— Gianone Park Area <br /> Belvedere Avenue Gianone Park Area Golden Gate Avenue <br /> Sta 10+40 to Sta 14+85 1,087 SQYD Golden 'Gate Avenue gp <br /> Euclid Avenu gw=m 0 ' <br /> Sta 30+25 to Sta 33+73 927 SQYD p 1921_ <br /> Sta 34+79 to Sta 41+13 1,690 SQYD <br /> Higgins Avenue <br /> Sto 20+30 to Sta 25+60 1,412 SQYD <br /> Stadium Drive <br /> Sta 30+25 to Sta 39+08 2,354 SQYD MINOR CONCRETE <br /> Gianone Park Area (CURB, GUTTER AND SIDEWALK) <br /> Golden Gate Avenue Location Quantity <br /> Sta 18+35 to Sta 38+60 6,689 SQYD <br /> Harding WaX Alvine Hefahts <br /> Sta 16+15 to Sta 29+19 2,466 SQYD Euclid Avenue <br /> Vine Street Sta 31+12 to Sta 31+21 (Right) 9 LF <br /> Sta 1,0+42 to Sta 30+35 3,542 SQYD Sta 31+28 to Sto 31+50 (Left) 22 LF <br /> ti Sta 32+14 to Sta 32+18 (Right) 4 LF <br /> Total 20,167 SQYD Sta 32+46 to Sta 32+53 (Left) 7 LF <br /> Sta 32+96 to Sta 33+04 (Right) 8 LF <br /> 12 Inch Dia. REINFORCED Sta 32+98 to Sta 33+08 (Left) 10 LF <br /> o - Sto 34+00 to Sta 34+06 <br /> CONCRETE PIPE (CLASS III) Sta 35+34 to Sta 35+54 (Left) 20 LF <br /> Sta 36+47 to Sta 36+53 (Left) 6 LF Ww '-�' <br /> Z Location Quantity Sta 38+38 to Sta 38+45 (Right) 7 LF <br /> m _Gianone Park Area (Left) <br /> Sta 39+00 to Sta 39+06 Left 6 LF <br /> Golden Gate Avenue Sta 39+60 to Sta 39+66 (Right) 6 LF <br /> 1111111111101--ir-I&Nt) Sta 40+51 to Sta 40+57 (Left) 6 LF "\ <br /> Higgins Avenue - <br /> at <br /> Sta 23+00 to Sta 23+11 (Left) 11 LF <br /> Sta 24+08 to Sta 24+25 (Left) 17 LF J <br /> 18 Inch Dia. STORM DRAIN INLET Stadium Drive <br /> Sta 31+88 to Sta 31+92 (Left) 4 LF 18 Inch Dia. FRAME AND GRATE <br /> Location Quantity Sta 34+96 to Sta 35+08 (Left) 12 LF Location Quantit <br /> (01 �, Sta 35+51 to Sta 35+58 (Right) 7 LF y <br /> Gianone Park Area Sta 35+76 to Sta 35+80 (Left) 4 LF Gianone Park Area j <br /> o Golden Gate- Avenue Sta 36+80 to Sta 36+84 (Right) 4 LF Golden Gate Avenue <br /> t) Sta 37+00 to Sta 37+09 (Right) 9 LF <br /> rri <br /> - Total 185 LF <br /> 0 z <br /> 0 <br /> COUNTY OF SAN JOAQUIN No SCALE SUMMARY OF QUANTITIES ALPINE HEIGHTS do GIANONE PARK AREA RESURFACING s4eof N 4 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE APPROVAL RECOMMENDED DATE <br /> L. Aguilar 12110 - — m I'1't �s�i�� � /Z t7�10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.