My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600501 thru PS-1601000_ - PS-1600744
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1600501 thru PS-1601000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600501 thru PS-1601000_ - PS-1600744
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 8:50:37 AM
Creation date
3/29/2016 4:43:14 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1600744
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1600501 thru PS-1601000
Year2
2016
Address
S/S OF ELVIN AV 231'W/O CARDINAL AV
Application
PACIFIC GAS & ELECTRIC - STOCKTON
Supplemental fields
APN
PS-1600744
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
See Note 'I Below <br />~Existing-\r--,Pavement,'\--j <br />I <br />,00 I,-=+20"Min <br />RIGID CONDUIT <br />",<,"See Note 2 Below,;Compact in 12"max <br />loyers to a min relativecompactionof95% <br />Min <br />00~+20"Min <br />FLEXIBLE CONDUIT <br />10"Min <br />I <br />I <br />NOTES, <br />1,New povement shall be 1"thicker than existing pavement,minimum <br />of 0,25 Ft New base shall be 1"thicker than existing base,min of 0,50 Ft <br />2,Select native material or imported granular moterial as approved by the Director <br />of Public Works.Backfill with materials equal to or better than the existingpavementandbaseinquality. <br />3.Relative compaction of materials shall be tested In accordance with <br />the State of California,Dept of Transportation Testing Manuals,testmethodNo,California 216 or 231. <br />4.All existing pavement shall be neatly cut to line prior to trench excavation, <br />5 Jetting or ponding will be permitted within the street right-of-way with <br />a 3 year bond,when approved by the Director of Public Works, <br />6,When shown by soil composition and compactability,ninety percent (90%) <br />compaction may be used,when approved by the Director of Public Works, <br />7.Special bedding'and backfill requirements may be shown on the plans orspecifiedinthespecialprovisions. <br />Approved by: <br />No.Revision Description Date
The URL can be used to link to this page
Your browser does not support the video tag.