Laserfiche WebLink
SPECIAL PROVISIONS <br />Winter Weaflier Utility Work <br />1.SVPER";i1SiIoN:.TIleutility company (permittee)shall fiJnRshfull-.time supervision of all work ts insure.compliance with the pe:i:oJitprovision.. <br />2.START OF WORK:No work wriliin the Countyrig1t-of,way shall be started untiHhe utility company <br />representative has made an evaluation of weather conditi8Dsand has determined the work can be . <br />"accoIrJ.jJIishedunder the provisions ofthe pe:i:oJit. <br />3.CLEAN P AVEI\1ENT:Dirt ana mud s1;J.allnotbe deposited on the pavement outside the area of work, <br />and .ifinadvertent!y tracked o:otothe rpad travel way sha11be removed illlliJ.ediately. <br />4.DAILY REBTORA.T'Ii:JrJ:'Private driveways and road intersections shaH be.restoreddaily. <br />5.WEATHER-TIGHT CONDITIONS:All trenches sh811be filled and compacted,ditches and ollier <br />c1mlllagefacilities regarded and opened,and the entire work area restored toweathedight condition prior to .any nUll.