Laserfiche WebLink
l-V) <br />0=:W3!:o--lu.. <br />Flower Street subject to pavement cuts shall <br />receive an (l)-inch asphalt concrete overlay from <br />the centerline (or lane line)to the edge of the <br />travelled way as per the SanJoaquin County Trench <br />Cut Policy.If the pavement is disturbed on both <br />sidesof the centerline (or adjacent lane),then the I <br />entire roadway (or affected lanes)shall be resurfaced. <br />Contractor shall grind and overlay within 10 working <br />days of permanent trench paving.Shoulder areas <br />shall be brought up to the finish grade asdirected by <br />the County. <br />g'20'••••••II' <br />EXCAVATE(I)4'.8'BEWlOLE <br />TO REI'L'£E CAS SERVO: <br />T 14' <br />5555 52'1 <br />-;;:.~~~-;;:.;;,-;;,-E MAIN 5T <br />EST: <br />AOE:COLB <br />SUPV: <br />REP: <br />PLNR: <br />SCALE:1"=100' <br />GAS LINE REPLACEMENT <br />5555 E I.IAIN ST <br />STOCKTON <br />PACIFIC GAS AND ELECTRIC COMPANY <br />co:SO: <br />NOTlF:OTHER: <br />SHT:1 OF I <br />PM'•31167175 <br />SHEETS <br />REV.