Laserfiche WebLink
NOTES: <br />1.If the distance between cross-cuts are less then 150'the entire area between <br />corss-cuts shall be planed and resurfaced with one (1)inch of Asphalt Concrete. <br />2.The resurfacing requirements shall be in addition to County Standard Drawing No.R-29. <br />3.Resurfacing for Bell Holes shall meet these requirements.If excavation occurs within <br />the shoulder or lane,only that area shall be resufaced as shown. <br />4.If cross-cutting is performed on Local Roads at intervals less then 150'a Seal <br />Coat for that half of the roadway containing the trench can be used in lieu of <br />resurfacing.Section 2-5.03 (8-2). <br /><J <br />C "'o ~~Q)Q)~L00oc't"o",cu",0 ~ <br />",£0c~.J:::;:;~g- <br />8'."!,,<{Paved Shoulder ----r-I I ~g ,-.:ill .1DJl1iT'0IT'0 <br />.L ~i 'it~,I ,~!i !ZI I 1 I ~ <br />~I I I ~ <br />Ul1 I 1 W,I , <br />TI -lTt~o ••...u.L-,0~'".-'"lEeLLLu~U <br />~.'b7 TRENCH CUTTING POLICY APprol~~:/II;".,,,-,CROSS CUTTING OF jt/fJw/!~T <br />111"11 &:..~COUNTY ROADWAYS No.Revision Description Date <br />~V\.2}lP COUNTY OF SAN JOAQUIN <br />•.DEPARTMENT OF PUBLIC WORKS .JWorkingforYOUIDate:MAY2015IStd.Dwg.No.R-36