Laserfiche WebLink
NOTES: <br />1.The resurfacing requirements shail be in addition to County StandardDrawingNo.R-29. <br />2.If longitudinal cuts are required on a Local Road a Seai Coat can be used <br />for that half of the roadway containing the trench.Section 2-5.03 (B-1). <br />3'minimum. <br />f <3',the remaining <br />pavement shail be removed <br />and reploced beforeresurfacing. <br />Section 2-5.02 (B-1). <br />Area to be resurfaced with <br />one (1)inch Asphalt <br />Concrete overlay existing <br />surface to be planed toaccommodateoverlay. <br />Section 2-5.02 (B-1). <br />r-iPaved Shoulder <br />0..W <br />r'~I !%!BI, <br />I, <br />I I, <br />I <br />I <br />, <br />I, <br />I, <br />t I, <br />f I, <br />~I, <br />~ <br />I, <br />I 'M'/1 <br />, <br />I, <br />I Iiw <br />Area to be resurfaced with <br />one (1)inch Asphalt Concrete <br />overlay existing surface to be <br />planed,to accommodate overlay. <br />Section 2-5.02 (B-2)'11 <br />1"'1 <br />.Area to be resurfaced with <br />one (1)inch Asphalt Concrete <br />overlay existing surface to be <br />planed to accommodate <br />overlay.Section 2-5.02 (B-2) <br />No.Revision Descri tion Date <br />Approved by: <br />jI.L!fir~~ <br />~ <br />Working for YOU <br />TRENCH CUTTING POLICYLONGITUDINALCUTTING <br />OF COUNTY ROADWAYS <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />Dale:MAY 2015 Std.Dwg.No.R-37