Laserfiche WebLink
NOTES: <br />1.If the distance between cross-cuts are less then 150'the entire area between <br />corss-cuts shall be planed and resurfaced with one (1)inch of Asphalt Concrete. <br />2.The resurfacing requirements shall be in addition to County Standard Drawing No.R-29. <br />3.Resurfacing for Bell Holes shall meet these requirements.If excavation occurs within <br />the shoulder or lane,only that area shall be resufaced as shown.. <br />4.If cross-cutting is performed on Local Roads at intervals less then 150'a Seal <br />Coat for that half of the roadway containing the'trench can be used in lieu of <br />resurfacing.Section 2-5.03 (B-2). <br />'DCo (J)..., <br />~(J)(J)~Lu~UoCt(J)O:JcUwO..., <br />a>.£:0c~...c=+::i~o...w w'x Q)« <br />QJg'+-.,to <br />C:J.£:j.2~gL._ <br />f <br />~w <br />-l <br />f:;13U <br />...,w.-wEe:..:Jo <br />Approved by: <br />jfLIPr <br />No.1 Revision Descriotion I Date <br />~~4~ <br />Working for YOU <br />TRENCH CUTTING POLICYCROSSCUTTINGOFCOUNTYROADWAYS <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />IDote:MAY2015IStd.Dwg.No.R-36