Laserfiche WebLink
,. <br />See Note 1 Below <br />10"Min10"10"Min <br />)' <br />~)' <br />~)' <br />~)'~'.."Compact in 24 max' <br />~loyers to a min relative <br />~compaction of 85%. <br />Compact in 6"layerstoaminrelative <br />compaction of 90%. <br />,,<"See Note 2 Below;;Compact in 12"max <br />layers to a min relative <br />compaction of 95% <br />under pavement and <br />90%outside pavement. <br />+OD+20"Min <br />RIGID CONDUIT FLEXIBLE CONDUIT <br />NOTES: <br />1.New pavement shall be 1"thicker than existing pavement.minimum <br />.of 0.25 Ft.New base shall be 1"thicker than existing bose.min of 0.50 Ft. <br />2.Select native material or imported granular material as approved by the Director <br />of Public Works.Backfill with materials equal to or better than the existing <br />povement and base in quality. <br />3.Relative compaction of materials shall be.tested in accordance with <br />the State of California,Dept.of Transportation Testing Monuals.test <br />method No.California 216 or 231. <br />4.All existing pavement shall be neatly cut to line prior to trench excavation. <br />5.Jetting or ponding will be permitted within the street right-of-way with <br />a 3 year bond.when approved by the Director of Public Works. <br />6.When shown by soil composition and-compactability,ninety percent (90%) <br />compaction may be used.when approved by the Director of Public Works. <br />7.Special bedding and backfill requirements may be shown on the plans or <br />specified'in the special provisions. <br />Approved by: <br />No.Revision Descri ticn Dote <br />TYIPCAL TRENCH BACKFILL <br />R-29. <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBUC WORKS <br />Dote:DEC 2014 Std.Dwg.No.:WorkiDg.for YOU