My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600501 thru PS-1601000_ - PS-1600592
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1600501 thru PS-1601000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600501 thru PS-1601000_ - PS-1600592
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 8:49:28 AM
Creation date
4/20/2016 2:34:08 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1600592
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1600501 thru PS-1601000
Year2
2016
Address
S/S LORRAINE 800'W/O MACARTHUR
Application
PACIFIC GAS & ELECTRIC -STOCKTON
Supplemental fields
APN
PS-160592
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
,. <br />See Note 1 Below <br />10"Min10"10"Min <br />)' <br />~)' <br />~)' <br />~)'~'.."Compact in 24 max' <br />~loyers to a min relative <br />~compaction of 85%. <br />Compact in 6"layerstoaminrelative <br />compaction of 90%. <br />,,<"See Note 2 Below;;Compact in 12"max <br />layers to a min relative <br />compaction of 95% <br />under pavement and <br />90%outside pavement. <br />+OD+20"Min <br />RIGID CONDUIT FLEXIBLE CONDUIT <br />NOTES: <br />1.New pavement shall be 1"thicker than existing pavement.minimum <br />.of 0.25 Ft.New base shall be 1"thicker than existing bose.min of 0.50 Ft. <br />2.Select native material or imported granular material as approved by the Director <br />of Public Works.Backfill with materials equal to or better than the existing <br />povement and base in quality. <br />3.Relative compaction of materials shall be.tested in accordance with <br />the State of California,Dept.of Transportation Testing Monuals.test <br />method No.California 216 or 231. <br />4.All existing pavement shall be neatly cut to line prior to trench excavation. <br />5.Jetting or ponding will be permitted within the street right-of-way with <br />a 3 year bond.when approved by the Director of Public Works. <br />6.When shown by soil composition and-compactability,ninety percent (90%) <br />compaction may be used.when approved by the Director of Public Works. <br />7.Special bedding and backfill requirements may be shown on the plans or <br />specified'in the special provisions. <br />Approved by: <br />No.Revision Descri ticn Dote <br />TYIPCAL TRENCH BACKFILL <br />R-29. <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBUC WORKS <br />Dote:DEC 2014 Std.Dwg.No.:WorkiDg.for YOU
The URL can be used to link to this page
Your browser does not support the video tag.