My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600501 thru PS-1601000_ - PS-1600592
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1600501 thru PS-1601000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600501 thru PS-1601000_ - PS-1600592
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 8:49:28 AM
Creation date
4/20/2016 2:34:08 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1600592
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1600501 thru PS-1601000
Year2
2016
Address
S/S LORRAINE 800'W/O MACARTHUR
Application
PACIFIC GAS & ELECTRIC -STOCKTON
Supplemental fields
APN
PS-160592
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
,, <br />SPECIAL PROVISIONS <br />.,:", <br />Winter Weath-erUtility Work <br />'.. <br />1.SUPERVISION:The utility comp8.l?'Y(per;lIiitte.e)shall furnisn fullotime supervision of all work to insure <br />.compliance with the permit provision......''.''., <br />2.START OF WORK:No work within the 'County.rfght-of-way shall be strmed:until the utility company <br />representative has made an evaluation of weather'conditions and has determined the work can be' <br />"accomplished under the provisions of the'permit.. <br />.','.. <br />3.CLEAN FA VEMENT:Dirt and mud s~ail no:tbe deposited'on the pavement outside the area of work, <br />and if inadvertently tracked onto.the road trfiy:el1Yaj'~ha1l:beremoved.imniediafely.. <br />4.DAn,Y RESTORATION:'Pri\fate drlv6Ways'ari.dtoad intersections shall be restored daily. <br />5.WEATHER-TIGHT CONDmONS:.All:tJ;enches shan be filled and compacted,ditches and:other <br />drainage facilities regarded and opened,and 'the entire y.rorkare"restored t~'weather-tight condition.prior to .......any ram...'...'. <br />.---- <br />'.:'.. <br />~..-...:.," <br />".. <br />..".'~.'. <br />.:.. <br />.": <br />F;\PER.MrrS COUNTER\generaI provisions\W'inter WeatberProvisi0r:s.doc:x'
The URL can be used to link to this page
Your browser does not support the video tag.