Laserfiche WebLink
2.Cross-cutting is aiiowedullder the same conditions as Section 2- <br />5.02(8)(3).If cro'ss-cuts occur with III the 150 feet minimum interval, <br />resurfacing may be substituted with a slurry seal fOI"that half of <br />the roadway.(See County Standard Drawing No.R-36). <br />2-5.04 Exceptions <br />Excavation Is prohibited in newly renovated County roadways for three (3) <br />years after a notice of completion has been filed for a madway improvement <br />project,or a new roadway has been accepted.The Director of Public Works <br />may approve exceptions that are in the best interest of the public,Including <br />but not limited to:. <br />A.An emergency that enda,ngers life or property, <br />B,For repair or modification to prevent interruption of essential utility <br />service, <br />C,For relocation work that is mandated by County,State or Federal <br />law, <br />D.FOI"service for buildings where no other reasonable means of <br />pmviding service exists, <br />E,For potholing to vel'ify utility depth or location, <br />F,Fm trenchless excavations greater than three feet in depth of cover <br />over"the utility facility,and not requiring a significant surface <br />Incision greatel"than industry bore pit standards <br />Exceptions must be requested and submitted In writing to the Department. <br />Payment of a nonrefundable processing fee is also required.Exceptions <br />will be reviewed using the Departments Action Approval process,which <br />requires the recommendation of a Deputy Director". <br />43