Laserfiche WebLink
,.. <br />If the distance between cross-cuts are less then 150'the entire crreo between <br />corss-cuts sholl be planed and resurfaced with one (1)inch of Asphalt Concrete, <br />The resurfacing requirements sholl be in addition'to County Standard Drawing ~Io.R-29,' <br />Resurfacing for Bell Holes sholl meet these requirements,If excavation occurs within <br />the shoulder or lone,only that area shall be resufaced as shown, <br />If cross-cutting is performed on Local Roads at intervals less then 150'a Seal <br />Coat for that half of the roadway containing the trench can be used in lieu of <br />resurfacing,Section 2-5,03 (B-2), <br />2, <br />3, <br />4, <br />....-.-•.-.-•...---...•-,'.-.........•-_"..•.•...',..•_-,,_._,,~-_._---_._._-..-.,-"_._.•._._.__..--.-"I <br />NOTES <br />1 <br />~[J)••[J)E2..:Ju <br />1 <br />F-1 I II,I , <br />I I II <br />'/:'/:%///~;;;:;;:;;~~:;;'/:'/:// <br />:;;'/:,,~!I II,21 I IIaz', <br />"I I I lI",,Ulj I I wI,,, <br />'/: <br />.7 • <br />~.::::wIII ; <br />,,___1 ,I! <br />Paved Shoulder-r1cr <br />T <br />Ta <br />o <br />.i-TaI <br />Approved bY' <br />No.Revision Oeser!Hon Date