My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600000 thru PS-1600500_ - PS-1600453
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1600000 thru PS-1600500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600000 thru PS-1600500_ - PS-1600453
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 8:45:55 AM
Creation date
4/27/2016 2:14:45 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1600453
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1600000 thru PS-1600500
Year2
2016
Address
E/S BELVEDERE AV 171'S/O E EUCLID AVE
Application
SEFNCO- CHRIS PERRY
Supplemental fields
APN
PS-1600453
Cross Ref
PWP7110005
Type (2)
Encroachment Permit (EP)
Zip
94550
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
Q2 <tl-i:uw Z...IW 00tnI-•••;:)-et ;:z0 Z(I)-InD::•••••D::et N::c M <br />l"-I-N -It):lE <br />I"-0::N WNa.. <br />,I <br />,I <br />! <br />I,q <br />COMCAST <br />@"~.@) <br />UUVERWG UCEU.VOC£" <br />COVER <br />1 OF 5 <br />•Colh:;I1111M, <br />COll\'Cllltnl C,-.r Cille' <br />EurOIIC!.ln Motor!; <br />!1.- <br />'T~.-ri'" <br />., <br />~.COMCAST <br />HARRISON AUTO ELECTRIC <br />3245 N WILSON WAY STOCKTON,CA <br />PROJECT DESCRIPTION" <br />NEW AERIAL =OFT, <br />OVERLASH =OFT. <br />NEW UNDERGROUND =271 FT. <br />EXISTING UNDERGROUND =OFT. <br />RISER (0)=OFT. <br />TOTAL FOOTAGE =271 FT. <br />CONTACTS: <br />SEFNCO <br />ANTONIO ANDUJO 925-783-8386 <br />SHEET INDEX: <br />1 COVER SHEET <br />2 NOTES &LEGEND SHEET <br />3 DETAILS SHEET <br />4 PROPOSED CONSTRUCTION <br />5 TRAFFIC CONTROL PLANS <br />SCOPE OF WORK: <br />-TIE INTO EXISTING VAULT IN LANDSCAPE.DIRECTIONAL DRILL EAST <br />APPROX.80'ACROSS BELVEDEREAVE.PLACENEW B36 VAULT IN <br />LANDSCAPE.DIRECTIONAL DRILL SW APPROX.120'DOWN <br />BELVEDEREAVE.PLACENEW B36 VAULT IN LANDSCAPE. <br />DIRECTIONAL DRILL SW APPROX.63'ACROSS EALPINE AVE.PLACE <br />NEW B36 VAULT IN LANDSCAPE.DIRECTIONAL DRILL SOUTH <br />APPROX.8'TO TARGETBUILDING 324S N WILSON WAY.PLACENEW <br />2"CONDUIT &COMM CA8LE IN NEW BORE PATHS. <br />BILL OF MATERIALS': <br />271 FT -2"SCHEDULE 40 CONDUIT <br />II'ALL fOOTAOU ANI>IIIAlERlAlS,\lIE nTUl"TED II
The URL can be used to link to this page
Your browser does not support the video tag.