My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1601001 thru PS-1601500_ - PS-1601268
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1601001 thru PS-1601500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1601001 thru PS-1601500_ - PS-1601268
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 8:51:48 AM
Creation date
5/5/2016 2:36:13 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1601268
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1601001 thru PS-1601500
Year2
2016
Address
N/S ORANGE AV 265'W/O SEIDNER RD
Application
PACIFIC GAS & ELECTRIC -STOCKTON
Supplemental fields
APN
PS-1601268
Cross Ref
PWP7110005
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
,' <br />".. <br />SPEC,IAL PROVISIONS <br />Winte.Weather Utility Work <br />.'" <br />1.SUPERVISION:The utility comp~y (pe~mittee)shall furnisb fullotime sUpervision of all work to'insure <br />,compliance with the permit provision.",.....'-'".'.... <br />,,2.START OF WORK:No,work within th<:i'County.rfght-of-wayshall be started until the utility.company <br />representative has made an evaluation of weather conditions and has determined the-work can be' <br />"accomplished under the provisions of the'permit.' <br />3.CLEAN PAVEMENT:'Dirt and mud s];mIlnot be d~p~;it~d'on the pavement outside the area of work, <br />and if inadvertently tracked outo'the road trily:el'\YaY'~haIl be'removed ironiediafely.' <br />4.DAILY RESTO RATION:'Pri\fate drivew1iys'aridtoad intersections shall be restored daily. <br />5.WEATffER-TIGHT CONDmONS:,).)lb;eiJ.ches shan be,filled andcc5mpaeted,.ditches and oilier , <br />drainage facilities regarded and opened,.and the 'entire work are",restored to 'weather-tight condition-prior to',..'...any ram.''",",.','~..'~," <br />,----., <br />":'.. <br />",.-,..:." <br />".. <br />",.:."..".'~..'. <br />..... <br />.'.:. <br />",
The URL can be used to link to this page
Your browser does not support the video tag.