P5-1500726 November 12, 2015 <br />SPECIAL CONDITIONS FOR <br />WSD — ORANGE ST. PROJECT <br />ENCROACHMENT PERMIT <br />1.Maintain traffic controls for all roads. Traffic control delays shall not exceed 15 minutes. <br />Two-way traffic shall be maintained during non-working hours with excavated areas backfilled or <br />plated. During working hours, two-way traffic control shall be maintained with one lane open and <br />appropriate flaggers. <br />2. Access to all properties shall be maintained at all times except when work is occurring at the <br />access point. Minimal delays will be allowed to provide access within the work zone area. <br />Driveway access shall be fully restored at the end of each workday. Driveways disturbed by thecontractorshallbereplacedwithin-kirid or better materials. <br />3.Residents and businesses shall be no`ified in writing, as approved by the County, 48 hours in <br />advance of any impacts to their access. <br />4. Any areas where parking is to be restricted shall have signs noting the restrictions in place at <br />least 48 hours in advance. <br />5.Work shall not be permitted within the San Joaquin County right-of-way between November 1 and <br />March 31 without prior authorization from the San Joaquin County Field Engineering Division, <br />contact them at 209-953-7421. <br />6.Final paving for trench repair or road rE surfacing shall be per Caltrans' specifications and shall <br />not occur between November 1 and March 31, without prior authorization from the San Joaquin <br />County Field Engineering Division, contact them at 209-953-7421. <br />7. All pavement markings destroyed or obliterated must be replaced in kind by the permittee. Typical <br />pavement markings include, but not limited to, lane lines, centerlines, stop and stop ahead <br />legends, limit lines, raised pavement markers and miscellaneous delineators. <br />8.The Permittee is responsible for the preservation of survey monuments located within the area of <br />work herein permitted. Prior to the start of construction, survey monuments that potentially maybedisturbedshallbelocatedandreferencedbyaLicensedLandSurveyor, and a Corner Record <br />filed with the County Surveyor. Any Survey Monuments disturbed during the course of <br />construction shall be reestablished by a Licensed Land Surveyor and another Corner Record filed <br />with the County Surveyor. (Land Survey/ors' Act Section 8771) <br />9. All pipe and pipeline related facilities including, but, not limited to, valves, utility boxes and vaults, <br />and frames and covers shall be maintained by Woodbridge Sanitary Sewer District (WSD). WSD <br />shall be responsible for any and all costs associated with the removal, relocation and/or <br />adjustment of these facilities as determ ned by the County at WSD's expense. (Streets andHighwaysCodeSection1463) <br />10. All future maintenance of the pipeline and related facilities within the County right-of-way willrequireaSanJoaquinCountyEncroachmentPermit.