My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1500501 thru PS-1501000_ - PS-1500726
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2015
>
PS-1500501 thru PS-1501000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1500501 thru PS-1501000_ - PS-1500726
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:33:24 PM
Creation date
6/7/2016 1:58:41 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1500726
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2015\PS-1500501 thru PS-1501000
Year2
2015
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
Special Conditions for 2- <br />ENCROACHMENT PERMIT <br />11. Trenches shall be maintained in a smooth and even condition to the satisfaction of the Countythroughouttheprojectlimitsatalltimes. <br />12. All trenches shall be completely backfilled or shored and plated at the end of each workday, andtheroadwayrestoredtotwo-way traffic. If plating is to be used, a trench shoring and plating plan <br />suitable for traffic loadings shall be prepared by a registered civil engineer and submitted for prior <br />approval by the County. <br />13. The contractor shall use San Joaquin County Standard R-29 when backfilling trenches within the <br />County right-of-way. Where the existing road structural section is below standard, a minimum <br />section of 3 inches of asphalt concrete over 8 inches of aggregate base shall be required. <br />14. Temporary pavement shall be provided for all trench areas within three days of pavement <br />removal or by Friday of each week, whichever is more restrictive. <br />15. Contractor shall establish existing roadway and drainage grades within the construction area. <br />Any repair to roadways and adjacent areas shall match existing grades. Any proposed grade <br />changes shall receive prior approval from County. <br />16. School buses shall be passed through the work zone with minimal delays. <br />17. County roads shall be kept clean from mud and debris at all times along the access points and <br />work zone areas during entire project. All standard roadway striping and signage shall be clearly <br />visible, maintained and restored throughout the construction zone during and after the project. <br />18. In addition to standard dust control measures, streets shall be maintained in a clean condition, <br />free of dirt, mud and debris during construction activities. The contractor shall provide daily, or as <br />needed, street sweeping using a modern mechanical or vacuum-assisted street sweeper. <br />19. The contractor shall not conduct construction operations in rain or heavy fog conditions.
The URL can be used to link to this page
Your browser does not support the video tag.