My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1501501 thru PS-1502000_ - PS-1501726
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2015
>
PS-1501501 thru PS-1502000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1501501 thru PS-1502000_ - PS-1501726
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:37:02 PM
Creation date
6/7/2016 2:02:30 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1501726
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2015\PS-1501501 thru PS-1502000
Year2
2015
Address
SCHULTE RD. W/O MOUNTAN HOUSE PKWY.
Application
TED BRANDVOLD
Supplemental fields
APN
PS-1501726
Cross Ref
PWP110005
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
PS-1501726 August 14. 7.015 <br />SPECIAL CONDITIONS FOR <br />ENCROACHMENT PERMIT <br />1.Maintain traffic controls for all roads. Traffic control delays shall not exceed 15 minutes. <br />Two-way traffic shall be maintained during non-working hours. During working hours, two-way <br />traffic control shall be maintained with one lane open and appropriate flaggers. <br />2.Access to all properties shall be maintained at all times except when work is occurring at the <br />access point. Minimal delays will be allowed to provide access within the work zone area. <br />Driveway access shall be fully restorec at the end of each workday. Driveways disturbed by the <br />contractor shall be replaced with in-kine or better materials. <br />3.Businesses shall be notified in writing, as approved by the County, 48 hours in advance of anyimpactstotheiraccess. <br />4.Any areas where parking is to be restricted shall have signs noting the restrictions in place at <br />least 48 hours in advance. <br />5.Work shall not be permitted within the San Joaquin County right-of-way between November 1 and <br />March 31 without prior authorization from the San Joaquin County Field Engineering Division, <br />contact them at 209-953-7421. <br />6.Final paving for trench repair or road resurfacing shall be per Caltrans' specifications and shall <br />not occur between November 1 and March 31, without prior authorization from the San Joaquin <br />County Field Engineering Division, contact them at 209-953-7421. <br />7.All pavement markings destroyed or obliterated must be replaced in kind by the permittee. Typical <br />pavement markings include, but not limited to, lane lines, centerlines, stop and stop ahead <br />legends, limit lines, raised pavement markers and miscellaneous delineators. <br />8.The Permittee is responsible for the preservation of survey monuments located within the area of <br />work herein permitted. Prior to the star` of construction, survey monuments that potentially maybedisturbedshallbelocatedandreferEncedbyaLicensedLandSurveyor, and a Corner Record <br />filed with the County Surveyor. Any Survey Monuments disturbed during the course of <br />construction shall be reestablished by a Licensed Land Surveyor and another Corner Record filed <br />with the County Surveyor. (Land Surveyors' Act Section 8771) <br />9.County roads shall be kept clean from riud and debris at all times along the access points and <br />work zone areas during entire project. All standard roadway striping and signage shall be clearly <br />visible, maintained and restored throughout the construction zone during and after the project. <br />10. In addition to standard dust control measures, streets shall be maintained in a clean condition, <br />free of dirt, mud and debris during construction activities. The contractor shall provide daily, or as <br />needed, street sweeping using a modern mechanical or vacuum-assisted street sweeper. <br />11. The contractor shall not conduct construction operations in rain or heavy fog conditions.
The URL can be used to link to this page
Your browser does not support the video tag.