My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1601501 thru PS-1602000_ - PS-1601509
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1601501 thru PS-1602000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1601501 thru PS-1602000_ - PS-1601509
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 8:52:26 AM
Creation date
6/7/2016 2:34:35 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1601509
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1601501 thru PS-1602000
Year2
2016
Address
E/S WEBSTER AV 149'N/O EUCLID AV
Application
AT&T -FRESNO
Supplemental fields
APN
PS-1601509
Cross Ref
PWP730079
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
SPECIAL PROVISIONS.,.....',' <br />::.. <br />WinteJ;Weather Utility Work <br />.'.' <br />1.SUPERVISION:The utility compaify (per;JJritte:e)shall furnish ful1~timeslipervision of all work toksure <br />,compliance with the permit provision,",....".".,',.. <br />2.START OF WORK:No,work within the'County,right-of-way shall be~ed:until the utility company <br />representative has made an evaluation of weather 'conditions and has determined the work can be' <br />"accomplished under the provisions of the'permit .' <br />3.CLEAN PAVEM:ENT:'Dirt and mud sl;mllnot be d~p~;it~d'on th~pavement outs.lde the area of work, <br />and if inadvertentLy tracked onto"the road tril.)T~l'YaY'~ha1l:be'removed.in:miediafely.' <br />4.DAlLY RESTORATION:'Pri-iiatedrfV6Ways'ari.dtoad intersections shall be restored daily. <br />5.WEATHER-TIGHTcoNDmONS:,'A1ln;ench"s shall be,filled andccimpaeted,.ditches and other <br />drainage facilities regarded and opened,.and-the 'entire work are~restored t~'weather-tight condition prior to ',any~',,:',',"',....:.. <br />','.''.,"". <br />,-........ <br />'.:'.. <br />"..:." <br />".,'.' <br />,, <br />,, <br />I <br />..".,':."..:.'~.'.. <br />..... <br />....:. <br />'., <br />.."
The URL can be used to link to this page
Your browser does not support the video tag.