My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1601501 thru PS-1602000_ - PS-1601940
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1601501 thru PS-1602000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1601501 thru PS-1602000_ - PS-1601940
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 8:54:50 AM
Creation date
8/9/2016 11:31:12 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1601940
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1601501 thru PS-1602000
Year2
2016
Application
WESTECH INDUSTRIES, INC.
Supplemental fields
APN
PS-1601940
Cross Ref
PWP110005
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
PS-1601940 <br />SPECIAL CONDITIONS FOR <br />DAVIS RD.-PRIVATE PIPELINE <br />ENCROACHMENT PERMIT <br />July 7,2016 <br />1.Maintain traffic controls for all roads.Traffic control delays shall not exceed 15 minutes for local <br />traffic.Two-way traffic shall be maintained during non-working hours with excavated areas <br />backfilled or plated.During working hours,lane closure shall be used within the road closure to <br />regulate local traffic thru immediate work zone. <br />2.Access to all properties shall be maintained at all times except when work is occurring at the <br />access point.Minimal delays will be allowed to provide access within the work zone area. <br />Driveway access shall be fully restored at the end of each workday.Driveways disturbed by the <br />contractor shall be replaced with in-kind or better materials. <br />3 Residents and businesses shall be notified in writing 48-hours in advance of any impacts to their <br />access. <br />4.Emergency responder access to effected residences shall be maintained at all times. <br />5.Any areas where parking is to be restricted shall have signs noticing the time period placed at <br />least 48 hours in advance of the work. <br />6.Existing fences shall not be removed without written consent signed by the property owner and <br />submitted to the County prior to the removal.Fences removed shall be restored with in-kind or <br />better materials at the edge of the right-of-way <br />7.The Permittee shall be responsible for any and all costs associated with the removal,relocation <br />and/or adjustment of the private pipeline as determined by the County at the Permittee's <br />expense.(Streets and Highways Code Section 1463) <br />8.All future maintenance of the pipeline and related facilities within the County right-of-way will <br />require a San Joaquin County Encroachment Permit. <br />.9.Pipeline shall be on a straight grade a minimum of 30"below ditches or toe of embankment slope .. <br />10.Markers are to be set at the County right-of-way line (property line)on both sides of Davis Road. <br />Identifying the location of the pipeline crossing and the name of the contact person. <br />/11.The Permittee is responsible for the preservation of survey monuments located within the area of <br />work herein permitted.Prior to the start of construction,survey monuments that potentially may <br />be disturbed shall be located and referenced by a Licensed Land Surveyor,and a Corner Record <br />filed with the County Surveyor.Any Survey Monuments disturbed during the course of <br />construction shall be reestablished by a Licensed Land Surveyor and another Corner Record filed <br />with the County Surveyor.(Land Surveyors'Act Section 8771)
The URL can be used to link to this page
Your browser does not support the video tag.