Laserfiche WebLink
Special Conditions for <br />ENC.ROACHMENT PERMIT <br />-2- <br />12.County roads shall be kept clean from mud and debris at all times along the access points and <br />work zone areas during entire project.All standard roadway striping and signage shall be clearly <br />visible,maintained and restored throughout the construction zone during and after the project. <br />13.In addition to standard dust control measures,streets shall be maintained in a clean condition, <br />free of dirt,mud and debris during construction activities.The contractor shall provide daily,or as <br />needed,street sweeping using a modern mechanical or vacuum-assisted street sweeper. <br />14.The contractor shall not conduct construction operations in rain or heavy fog conditions. <br />15.Contractor shall establish existing roadway and drainage grades within the construction area. <br />Any repair to roadways and adjacent areas shall match existing grades.Any proposed grade <br />changes shall receive prior approval from County. <br />16.Any drainage ditches disturbed by construction shall be fully restored.It is the responsibility of the <br />applicant to ensure existing drainage channels/ditches convey drainage during and after <br />construction and match pre-construction conditions. <br />17.Contractor shall ensure that both exposed ends of the pipe extend beyond the County right-of- <br />way. <br />18 Applicant is required to enter into an agreement with San Joaquin County Public Works providing <br />for maintenances of the section .above the pipeline The obligations and covenants contained with <br />the agreement shall run with the land.