Laserfiche WebLink
a <br />N. <br />PROJECT LOCATION MAP <br />NO SCALE <br />Lei ' 810 <br />Call $11 Before You Dig <br />PROJECT ENGINEER DATE <br />CHECKED DATE APPROVED <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />STOCKTON, CALIFORNIA <br />RAYMUS VILLAGE RUBBERIZED CAPE SEAL <br />(Raymus Village Subdivision) <br />To Be Supplemented by Standard Plans Dated 2010 <br />and Revised Standard Plans <br />COUNTY OF SAN JOAQUIN <br />Submitted SAY 2018 <br />KRIS BALAJI <br />DIRECTOR OF PUBLIC WORKS <br />INDEX <br />OF <br />SHEETS <br />Sheet <br />No. <br />NORTHLAND <br />TITLE PAGE <br />Sheet <br />No. <br />2 <br />GENERAL NOTES <br />Sheet <br />No. <br />3 <br />TYPICAL SECTION AND <br />CURB RAMP SITE PLAN <br />W <br />No. <br />4 <br />RAMP 'DIMENSION SCHEDULE <br />Sheet <br />No. <br />5 <br />PROJECT LIMITS AND <br />Q <br />� <br />CONSTRUCTION DETAILS <br />Y <br />No. <br />6 <br />CONSTRUCTION DETAILS <br />Sheet <br />No. <br />Z <br />o <br />SUMMARY OF QUANTITIES <br />L <br />LL <br />Q <br />Y <br />� <br />U <br />COMANCHEUJI <br />m <br />N <br />W <br />LU <br />n z <br />W <br />a <br />SHOSHONE <br />z <br />O MOHICAN <br />a <br />0 <br />a <br />0 <br />a <br />Raymus Village Park <br />� <br />a <br />kp v <br />NpVP�O <br />PUEBLO <br />Y <br />'9 <br />�9 <br />Q <br />W <br />A <br />0 <br />" <br />0 <br />W <br />o <br />YUMA <br />0 <br />0� <br />W <br />a <br />20 <br />o <br />ca <br />W <br />CHOCTAW <br />O <br />W <br />Z <br />0 <br />W <br />5°ay <br />ZQ <br />N <br />M <br />BLACKFOOT <br />County <br />M <br />U) <br />LATHROP <br />PROJECT LOCATION MAP <br />NO SCALE <br />Lei ' 810 <br />Call $11 Before You Dig <br />PROJECT ENGINEER DATE <br />CHECKED DATE APPROVED <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />STOCKTON, CALIFORNIA <br />RAYMUS VILLAGE RUBBERIZED CAPE SEAL <br />(Raymus Village Subdivision) <br />To Be Supplemented by Standard Plans Dated 2010 <br />and Revised Standard Plans <br />COUNTY OF SAN JOAQUIN <br />Submitted SAY 2018 <br />KRIS BALAJI <br />DIRECTOR OF PUBLIC WORKS <br />INDEX <br />OF <br />SHEETS <br />Sheet <br />No. <br />1 <br />TITLE PAGE <br />Sheet <br />No. <br />2 <br />GENERAL NOTES <br />Sheet <br />No. <br />3 <br />TYPICAL SECTION AND <br />CURB RAMP SITE PLAN <br />Sheet <br />No. <br />4 <br />RAMP 'DIMENSION SCHEDULE <br />Sheet <br />No. <br />5 <br />PROJECT LIMITS AND <br />CONSTRUCTION DETAILS <br />Sheet <br />No. <br />6 <br />CONSTRUCTION DETAILS <br />Sheet <br />No. <br />7 <br />SUMMARY OF QUANTITIES <br />THE STANDARD PLANS APPLICABLE TO THIS CONTRACT <br />ARE INCLUDED IN THE PROJECT SPECIFICATIONS BOOK. <br />ABBREVIATIONS <br />(In addition to abbreviations shown on SP Al OA, RSP Al OB, <br />and Standard Specifications 1-1.06 Abbreviations) <br />BOW = Back of Sidewalk <br />CG&S = Curb, Gutter and Sidewalk <br />DWS = Detectable Warning Surface <br />IP = Intersection Point <br />n/o = north of <br />DATE <br />s 4 fir$ <br />o Q�OF ESS/04,91 <br />ME��a 61 <br />No. 42581 <br />k�ez'-Orc <br />CAS <br />r <br />David Mendoza <br />RCE 42581 <br />RSP = Revised Standard Plan <br />SDI = Storm Drain Inlet <br />SJCo Std = San Joaquin County Standard <br />SP = Standard Plan <br />Sheet No. <br />1 of 7 <br />