SPECIAL CONDITIONS FOR <br />ENCROACHMENT PERMIT <br />Maintain traffic controls for all roads. Traffic control delays shall not exceed 15 minutes. Two- <br />way traffic control shall be maintained with one lane open and appropriate flaggers. Flaggers <br />shall remain onsite 24 hours for the duration of the project. <br />2. Access to all properties shall be maintained at all times except when work is occurring at the <br />access point. Minimal delays will be allowed to provide access within the work zone area. <br />Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br />contractor shall be replaced with in-kind or better materials. <br />3. Residents and businesses shall be notified in writing, as approved by the County, 48 hours in <br />advance of any impacts to their access. <br />4. Any areas where parking is to be restricted shall have signs noting the restrictions in place at <br />least 48 hours in advance. <br />5. Existing fences shall not be removed without written consent of the property owner. Such consent <br />shall be submitted to the County prior to the removal. Fences removed shall be restored with in- <br />kind or better materials. Restored fences shall not encroach into County right-of-way. <br />Work shall not be permitted within the San Joaquin County right-of-way between November 1 and <br />March 31 without prior authorization from the San Joaquin County Department of Public Works <br />Field Engineering Division, contact them at 209-953-7421. <br />All destroyed or obliterated pavement markings must be replaced in kind by the permittee. Typical <br />pavement markings include but not limited to lane lines, centerlines, stop and stop ahead <br />legends, limit lines, raised pavement markers and miscellaneous delineators. <br />8. The Permittee is responsible for the preservation of survey monuments located within the area of <br />work herein permitted. Prior to the start of construction, survey monuments that potentially may <br />be disturbed shall be located and referenced by a Licensed Land Surveyor, and a Corner Record <br />filed with the County Surveyor, Any Survey Monuments disturbed during the course of <br />construction shall be reestablished by a Licensed Land Surveyor and another Corner Record filed <br />with the County Surveyor. (Land Surveyors' Act Section 8771) <br />9. All groundwater monitoring wells and groundwater monitoring wells related facilities including, but <br />not limited to, valves, utility boxes and vaults, and frames and covers shall be maintained by <br />GEO-LOGIC ASSOCIATES, including any facilities that are abandoned in place. GEO-LOGIC <br />ASSOCIATES shall be responsible for any and all costs associated with the removal, relocation <br />and/or adjustment of these facilities as determined by the County at GEO-LOGIC ASSOCIATES's <br />expense. (Streets and Highways Code Section 1463) <br />10. The contractor shall use San Joaquin County Improvement Standard R-29 when backfilling bores <br />within the County right-of-way. Where the existing road structural section is below standard, a <br />minimum section of 3 inches of asphalt concrete over 8 inches of aggregate base shall be <br />required. <br />