My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2018_PS-1800000 thru PS-1800500_ - PS-1800167
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2018
>
PS-1800000 thru PS-1800500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2018_PS-1800000 thru PS-1800500_ - PS-1800167
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 9:21:33 AM
Creation date
3/20/2019 10:22:26 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1800167
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2018\PS-1800000 thru PS-1800500
Year2
2018
Address
E/S SANTA ANA WY 1,900'S/O E MARIPOSA RD
Application
GEO-LOGIC ASSOCIATES
Supplemental fields
APN
PS-1800167
Cross Ref
PWP7110005
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
Special Conditions for -2- <br />ENCROACHMENT PERMIT <br />11. Final paving for trench repair or road resurfacing shall be per Caltrans' specifications and shall <br />not occur between November 1 and March 31, without prior authorization from the San Joaquin <br />County Department of Public Works Field Engineering Division, contact them at 209-953-7421. <br />12. County roads shall be kept clean from mud and debris at all times along the access points and <br />work zone areas during entire project. All standard roadway striping and signage shall be clearly <br />visible, maintained and restored throughout the construction zone during and after the project. <br />13. In addition to standard dust control measures, streets shall be maintained in a clean condition, <br />free of dirt, mud and debris during construction activities. The contractor shall provide daily, or as <br />needed, street sweeping using a modern mechanical or vacuum -assisted street sweeper. <br />14. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.