My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2018_PS-1802501 thru PS-1803000_ - PS-1802938 (2).tmp
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2018
>
PS-1802501 thru PS-1803000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2018_PS-1802501 thru PS-1803000_ - PS-1802938 (2).tmp
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 9:29:27 AM
Creation date
2/18/2021 9:15:41 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1802938 (2).tmp
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2018\PS-1802501 thru PS-1803000
Year2
2018
Address
CALIFORNIA WATER SERVICE
Supplemental fields
APN
PS-1802938
Cross Ref
PWP730077
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PS~ 1802938 <br />SPECIAL CONDITIONS FOR <br />CALWATER-ELMWOOD AVE. -#8420 <br />ENCROACHMENT PERMIT <br />August -14, 2018 <br />1. Maintain traffic controls for all roads. Traffic control delays shall not exceed 15 minutes. <br />Two-way traffic shall be maintained during non-working hours with excavated areas backfilled or <br />plated. During working hours, two-way traffic control shall be maintained with one lane open and <br />appropriate flaggers. <br />2. Access to all properties shall be maintained at all times except when work is occurring at the <br />access point Minimal delays will be allowed to provide access within the work zone area. <br />Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br />contractor shall be replaced with in-kind or better materials. <br />3. Residents and businesses shall be notified in writing, as approved by the County, 48 hours in <br />advance of any impacts to their access. <br />4. Any areas where parking is to be restricted shall have signs noting the restrictions in place at <br />least 48 hours in advance. <br />5. School Buses shall be passed through the work zone with minimal delays. <br />6. All destroyed or obliterated pavement markings must be replaced in kind by the permittee. Typical <br />pavement markings include but not limited to lane lines, centerlines, stop and stop ahead <br />legends, limit lines, raised pavement markers and miscellaneous delineators. <br />7. The Permittee is responsible for the preservation of survey monuments located within the area of <br />work herein permitted. Prior to the start of construction, survey monuments that potentially may <br />be disturbed shall be located and referenced by a Licensed Land Surveyor, and a Corner Record <br />filed with the County Surveyor. Any Survey Monuments disturbed during the course of <br />construction shall be reestablished by a Licensed Land Surveyor and another Corner Record filed <br />with the County Surveyor. (Land Surveyors' Act Section 8771) <br />8. All pipe and pipeline related facilities including, but not limited to, valves, utility boxes and vaults, <br />and frames and covers shall be maintained by Cal Water, including any facilities that are <br />abandoned in place. Cal Water shall be responsible for any and all costs associated with the <br />removal, relocation and/or adjustment of these facilities as determined by the County at Cal <br />Water's expense. (Streets and Highways Code Section 1463) <br />9. All future maintenance of the pipeline and related facilities within the County right-of-way will <br />require a San Joaquin County Encroachment Permit <br />10. Trenches/bell holes shall be maintained in a smooth and even condition to the satisfaction of the <br />County throughout the project limits at all times. <br />11. All trenches/bell holes shall be completely backfilled or shored and plated at the end of each <br />workday, and the roadway restored to two-way traffic. If plating is to be used, a trench shoring <br />and plating plan suitable for traffic loadings shall be prepared by a registered civil engineer and <br />submitted for prior approval by the County.
The URL can be used to link to this page
Your browser does not support the video tag.