Laserfiche WebLink
r-".�1-1mr ro^nc <br />������ <br />~�m�m�E�mm~m�r�n�mm =°""�m= �°�E"~°~°° <br />NTS <br />ION DIFUSER CAP <br />5^ DIA. P.V.C. PIPE ( <br />1. CONTRACTOR SHALL INSTALL BERM AND <br />DIVERSION DITCH AROUND PROPOSED LEACH <br />FIELD TO PROTECT FROM DIRECT SURFACE <br />STDRMWATER RUNOFF. <br />,PBl FILTER <br />( OR <br />VED MATERIAL <br />'2" GRAVEL <br />11711 �Rlfl <br />� <br />� <br />� <br />� <br />� <br />� <br />C <br />, <br />EXISTING GRADE <br />ASHED DRAIN ROCK <br />PIPE <br />CLEANOUT LID <br />(WHERE <br />ADJUST TO FINISH GRADE- -CONCRETE OCCURS) <br />Z'47' F <br />. MIN TO " " <br />THREADED CLEAN --OUT PLU <br />CLEAN --OUT RISER <br />SEE PLANS FOR PIPE <br />SIZE AND SLOPE" <br />SEE PLANS FOR PIPE <br />SIZE AND SLOPE <br />NTS <br />5OBSERVATION WELL� <br />NTS <br />CHRISTY VALVE <br />BOX TRAFFIC RATED <br />1.25^ P.V.C. PIPE <br />VALVE AS PER <br />MAN UFAC |URER'S <br />^ <br />SPECIFICATIONS <br />�"`'�"= |\ . <br />�`-1�25 P.J.C. PIPE TANP <br />CHRISTY BOX --- SCREW CAP <br />U 125" \( <br />PC. <br />DOSING UNE <br />END OF LEACH <br />UNE �YP.) " " <br />` ' 4 INSPECTION PIPE 2 <br />X 1/4" SLOTS AT 12^ O�C, <br />�| <br />STAGGERED (O`. 1�O`. 240^) <br />STOP SLOTS AT 1/2 HEIGHT <br />' <br />CHR|3TY V -i PR0TECTON BOX WITH CHR|3TY <br />F08R CONCRETE UD, OR CHR|STY G05T <br />PROTECTION 80X WITH CHR|STY No. G05CT <br />LID, OR EQUIVALENT, <br />``-SEE PLANS FOR PIPE <br />SIZE AND SLOPE <br />FLEX JOINT CONNECTION <br />1. CLEAN-OUT RISER SHALL BE <br />THE SAME SIZE AS THE <br />LATERAL. <br />2. CLEAN-DUT RISER TO BE OF <br />SAME PIPE MATERIAL. AS THE <br />MAIN, <br />3. SEE SAN JOADU\N STANDARDS <br />AND SPECIFICATIONS FOR <br />ADDITIONAL INFORMATION <br />LONG RADIUS BEND <br />1. PUMP PACKAGE SHALL INCLUDE: <br />w EXTERNAL SPLICE BOX. <br />0 DUAL PUMP SYSTEM. <br />0 HIGH HEAD DISCHARGE ASSEMBLY, <br />0 SIMPLEX CONTROL PANEL <br />0 DISCHARGE ASSEMBLY. CONTRACTOR SHALL CONTACT <br />MANUFACTURER FOR ADDITIONAL RECOMMENDATIONS IF <br />OUTLET DEPTH IS GREATER THAN 18 INCHES. <br />0 B0 TUBE PUMP PACKAGE WITH FILTER CARTRIDGE AND <br />PUMP VAULT. <br />2. CONTRACTOR SHALL PROVIDE AND INSTALL ALL ADD|T|ONAL <br />PUMPING COMPONENTS PER MANUFACTURER'S SPECIFICATIONS <br />AND RECOMMENDATIONS. <br />1 ALARM CIRCUIT HAS TO BE DEDICATED AND SEPARATE FROM <br />PUMP CIRCUIT. <br />4, ALL SEPTIC TANK EQUIPMENT, INLETS, RISERS AND LIDS TO BE <br />PROVIDED BY CONTRACTOR IN ACCORDANCE WITH <br />MANUFACTURER'S SPECIFICATIONS AND RECDWWENDATlONS, <br />5� THE SWING BETWEEN THE "ON" AND "OFF" FLOATS AND THE <br />HIGH WATER ALARM SHALL BE DETERMINED IN THE FIELD, BASED <br />UPON TANK DIMENSIONS. <br />c,.mnnoT n/nc <br />END OF ��� �� EFFLUENT ��0�MP SYSTEM <br />�^�����m �����"°°��==����~°~��° DUAL <br />NTS N TS <br />COLONY OAK SCHOOL K-8 SCHOOL <br />Available Data: <br />PERCOLATION TEST= <br />PERCOLATION TEST DEPTH= <br />APPLICATION RATE= <br />DESIGN 000upANoYsTUDEmT= <br />ssnMxFED FLOW RATE PER STUDENT= <br />DESIGN OCCUPANCY STAFF= <br />ESTIMATED FLOW RATE PER PERSON= <br />2A min/inch (Estimated ooGeotechnical Report) <br />8 i <br />1.20gaKstday (Per Table 3of State OWTS Po|icy) <br />576 Students <br />oo gaVday/p000n(Per table H2o1 1(2). somm|a'oafeterja� <br />41 Staff (Estimated 5OEmployees) <br />cogavguy/person(Per table 1-12o| 1(2).ochoo|s'stafff <br />A.Daily Sewage Flow Rate <br />Total Daily Sewage Flow Rate =(Design Occupancy) x(Estimated rmwRatePerPmsmn) <br />TYPE FLOW RATE QUANTITY TOTAL-FLOW <br />Students 23 576 '15.2*8 gpd <br />Staff 20 41 e20 gpd <br />14,068 gou <br />mmlmm�, <br />Base Tank Capacrty= (Flow x0.n5)+ 1125 gallons (Per County ufSan Joaquin <br />Base Tank Capacity= 11,676 gallons (Per Table H2V11 nfthe California Plumbing Code) <br />C. Disposal Field Required Area <br />Total Flow= Base Tank Capacity + Total Daily Flow <br />Total Flow= 1/.678 + 14.068 <br />Tmo| Flow= 25744gavuay <br />Tmm|F/mw 25744 gal/day <br />Diopoua|rie|dA�a= = --Application Rate T,2c-gmxsnday <br />D/spuoe| Field Area= 21,454 or <br />0,Width ofTrenches <br />"French Width= co <br />Type of Trench= 4z''Max Depth French, per County Standards <br />Area Per Lineal Foot n,Trench= eomf <br />E.Total Length ofTrench Required <br />Disposal Field = o1454o, <br />Roqui/cd\en�ho/T�nch~Per <br />--����-- <br />Required Length orTrenoh= 23841f <br />PRESSURE DIS n*|BurmmNETWORK CALCuLxTONG <br />A. Type ofManifold= Central Manifold <br />B. Minimum Head Drain Field= n1 <br />C. Perforation Spacing= 5 # <br />D. Lateral Discharge Rate <br />Flow <br />Flow rate Perforatio <br />Elevation Number of Perforation No. <br />No. ID Length (ft) Laterals Diameter (in) per perf. n Spacing Rate <br />Perforations <br />7.41 <br />F - ------------ - <br />Total Length ofLaterals= 2384 ft <br />Number of Zones= 4 <br />E. volumoonPipe <br />Total discharge rate (gprn)= 206�37 gpm <br />F|nwporZone= 51.59 gpm <br />Total <br />Pipe Diameter Pipe vomma Volume to <br />|D Length (ft) (inch) (gal/fl) Fill Pipe <br />(gal) <br />Discharge Pipe u 2 0.163 0.82 <br />Manifold '157 1.5 0,092 1441 <br />Laterals per zone eoo 1.25 0,064 38.25 <br />Total Pipe Volume Per Zone= 53.4e <br />F. MmonumDose volumo <br />Minimum Dose Volume= 2OmwMaximum <br />Daily <br />Flow= 5.148.80 gy|oppmx, <br />o.PumpParameters Per Zone <br />Friction Headless <br />a= Flow rate <br />51.59 gpm <br />0= Flow rate <br />0.11ofs <br />g= Force Main Diameter <br />nm <br />E. L. F, Description <br />�= Force Main Length <br />2e2 n <br />1 Force Mom <br />zoz if <br />Discharge <br />12 ea <br />o�6 Discharge <br />72 If <br />90 Deg. Bumyo <br />u ea <br />0.3 90 Deg. Elbows <br />o If <br />45 Deg. Elbows <br />o ca <br />0,2 45 Deg. Bumwm <br />o If <br />Gate Valves <br />0 e <br />1.oGate va/ves <br />0 i <br />Chyr:Va|vms <br />0 e <br />2Check Valves <br />0 i <br />-fee Connection <br />n em <br />o.* Tee Connection <br />o if <br />omim <br />0 e <br />1 Outlet <br />nn <br />2692 If <br />= Hazen Williams Coen <br />|oo (PVC) <br />m= 10�44^1_°/ 1,85 <br />13.39 8 <br />oAJ,85*D^4.8e55 <br />vn|ocity*ead|eso: <br />A= n'd A 2/4 <br />0.02182 of <br />«= Q/A <br />5.27 fps <br />rw~ V^2/(2*g) <br />0.43 ft <br />Static Headless: <br />Discharge Elevation= 69�5 <br />Pump "off' s|esmmn= 58.5 approx. <br />hs = Maximum Static Head <br />'10 ft <br />Minimum Pressure on Leach field: <br />hu= Pressure Head <br />50 <br />Distributing Valve. Pressure: <br />17 o <br />Total Dynamic Headless: <br />TDH= fir+ hv+ om+ ou <br />45.82 ft <br />.RF -PMC SYMM CALCULATIONS <br />NTS <br />0111 If 1 00' W11100�� <br />1. DESIGN CRITERIk <br />1, 2016 CALIFORNIA PLUMBING CODE AND SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT ON -SHE WASTEWATER DISPOSAL <br />if. GENERAL NOTES: <br />1. -THE DISPOSAL SYSTEM COVERED UNDER THIS CONTRACT AND <br />DESIGNED HEREIN CONSISTS OF ALL WORK TO BE DONE AS SHOWN <br />ON -THE PLAINS. THIS WORK CONSISTS OF' THE CONSTRUCTION OF <br />THE DISTRIBUTION LINE WITH ITS APPURTENANCES AND THE <br />CONSTRUCTION OF THE LEACH FIELD SYSTEM. <br />2. APPROPRIATE SUPERVISION DURING CONSTRUCTION IS MANDATORY 10 <br />ENSURE THAT THE DESIGN IS ADHERED 1-0, TO PROVIDE THE DESIRED <br />FUNCTIONAL QUALITY OF THE SYSTEM. <br />111. DISPOSAL SYSTEM NOTES: <br />1, -THE SEWAGE DISPOSAL SYSTEM CONSISTS OF A DRAIN LINE FROM <br />THE BUILDINGS TO THE SEPTIC TANK, THE SEPTIC TANK, THE <br />DISTRIBUTION BOXES, THE CONVEYANCE LINES AND THE LEACH LINES. <br />2. CONVEYANCE PIPE SHALL. BE AS APPROVED BY SAN JOAQUIN COUNTY <br />STANDARDS AND "THE 2016 CALIFORNIA PLUMBING CODE, ANY <br />ANDARD <br />MATERIALS USED SHA1.1 CONFORM "TO THE CURRENT S1 <br />SPECIFICATIONS OF THE AMERICAN NATIONAL STANDARDS INSTITUTE. <br />3. SEPTIC -TANK: <br />PRIMARY SEPTIC TANK: (1) 15,000 GALLON <br />PRE --ANOXIC TANK: (1) 15,000 GALLON TANK <br />EQUALIZATION -TANK: (1) 30,000 GALLON <br />4LAYING PIPE: THE PIPE SHALL BE LAID TO CONFORM 1-0 THE <br />PRESCRIBED LINES AND GRADES, THE' LINE AND GRADE SHALL BE <br />OBTAINED BY MEANS OF A LASER OF -AM OR BY MEASURING FROM A <br />TIGHTLY STRETCHED STRING OR WIRE SET FROM THE SURVEY STAKES. <br />ALI.. ADJUSTMENTS OF PIPE 1-0 I. -INE AND GRADE SHALL BE MADE BY <br />-TAMPING UNDER THE BODY OF <br />SCRAPING AWAY OR FIL.I.-ING IN AND <br />THE PIPE, NOT BY BLOCKING OR WEDGING. <br />5. THE MANUFACTURER'S RECOMMENDATIONS ON PROPER PROCEDURES <br />FOR LAYING PIPE SHALL BE FOI I -OWED. <br />6ALL PIPE SHALL BE LAID WITH 'THE BELL END UPSTRFAM AND SHALL <br />BE LAID UPSTREAM FROM STRUCTURE -TO STRUCTURE. THREE GRADE <br />STAKES PER 100 FOOT INTERVAL SHALL BE PROVIDED, AND EACH <br />STAKE SHALL BE USED IN ESTABLISHING "THE GRADE AND <br />ALIGNMENT FOR -THE SEWER. <br />7LEACH LINES SHALL BE CONSTRUCTED AS PER THE DETAILS SHOWN <br />ON THE PLAN. <br />8DISTRIBUTION LINE: THE DISTRIBUTION PIPE SHALL BE P,V.C. 1120 <br />PRESSURE RATED PIPE 125 P,S.I.- SDR 32.5 CONFORMING TO <br />9CONNECTIONS: CONNECTIONS ARE TO BE MADE USING SOLVENT <br />CEMENT JOINTS PER MANUFACTURE'S RECOMMENDATIONS CAPABLE OF <br />SUPPORTING THE LINE RATED PRESSURE, <br />10LEACH LINES: USE RING TITE P.V.C. 1,25" PRESSURE PIPE TO BE <br />PERFORATED PER SAN JOAQUIN COUNTY STANDARDS, FITTINGS TO BE <br />RUBBER RINGS CONFORMING TO A.S,T,M. D1869. <br />I I GRAVEL: COARSE GRADED GRAVEL USED IN LEACH LINE IS TO BE 1 <br />INCH MINIMUM 10 2 1/2 INCH MAXIMUM WASHED ROCK AGGREGATE. <br />12. PROTECTION BARRIER� UNTREATED PAPER, FILTER FABRIC, STRAW, OR <br />OTHER APPROVED MATERIAL IS TO BE USED AS A BARRIER ON -TOP <br />OF fl -f GRAVEL SEPARATING THE ROCKS FROM THE SOIL BACKFILL. <br />13, RECORDS OF MONTHLY WATER USE SHALL BE MAINTAINED AND <br />COPIES MADE AVAILABLE TO THE ENGINEER AND/OR COUNTY UPON <br />14, TT ­IE TANKS SHALL- BE INSPECTED BASED ON COUNTY TIME DURATIONS <br />BY A SEPTIC SERVICE COMPANY TO ENSURE THAT THE CAPACITY OF <br />THE 'TANKS ARE OPERAIIONAL. 'THE RECEIPT, NAME AND DATE OF U r <br />11 <br />SERVICE OF THE COMPANY INSPECTING, OR PUMPING T E TANK Of , <br />SHALL BE PROVIDED TO THE COUNTY, OR THE ENGINEER UPON <br />15. -THE ON SITE SEWAGE DIVISION, OR OTHERS DESIGNATED, WILL ALSO <br />MONITOR THE WELLS, IF SYSTEM FAILURE IS DETERMINED, OR <br />EMINENT IN THE OPINION OF THE ON--SITE­SEWAGE DIVISION, A <br />SIMILAR SYSTEM WILL BE CONSTRUCTED IN THE RESERVE AREA <br />DESIGNATED. IT IS TO BE OPERATED ON AN ALTERNATIVE BASIS WITH <br />THE PRIMARY AREA. SIGNS OF SEPTIC SYSTEM FAILURE INCLUDE <br />DISCHARGE OF SEWAGE TO THE GROUND SURFACE AND SATURATED <br />UPPER SOILS HORIZONS DURING PERIODS OF DRY WEATHER. IF THE <br />SYSTEM IS CLEARLY FAILING, THE DESIGNER AND ON --SITE -SEWAGE <br />DIVISION SHOULD BE NOTIFIED IMMEDIATELY, WATER LEVELS IN THE <br />INSPECTION PIPES OR MONITORING WELLS WHICH ARE VERY NEAR <br />THE GROUND SURFACE MAY INDICATE POTENTIAL PROBLEMS BUT DO <br />NOT ALONE CONSTITUTE FAILURE. IN SUCH CASES, THE SYSTEM <br />SHOULD BE MONITORED MORE FREQUENTLY FOR (,LEAR SIGNS OF <br />FAILURE, PERHAPS ONCE PER WEEK UNTIL A CLEAR PATTERN IS <br />16TRIMMER VALVES SHALL- BE PLASTIC BALL VALVES, EQUAL TO THE <br />LATERAL, SIZE. 11E VALVES SHALL BE PROVIDED WITH VALVE BOXES <br />AND SHALL. BE SET IN A PEA GRAVEL BASE. <br />17, 'THE DISPOSAL FIELD SHALL BE DOSED BY P RESSURE. <br />1& ALL OTHER SEPTIC SYSTEM CONSTRUCTION DETAILS AS PER ON SITE <br />SEWAGE DIVISION REQUIREMENTS. <br />19. OWNER SHALL BE RESPONSIBLE FOR SCHEDULING INSPECTIONS. <br />20INSPECTIONS DURING CONSTRUCTION BY THE DESIGNER AND IN SOME <br />CASES, 'THE REGULATORY AUTHORITY ARE REQUIRED. THE INSTALLER <br />AND/OR OWNER ARE SOLELY RESPONSIBLE FOR CONTACTING THE <br />DESIGNER AND/OR REGULATORY AUTHORITY AT LEAST 24 HOURS IN <br />ADVANCE OF EACH REQUIRED INSPECTION, EVERY EFFORT WILL BE <br />MADE TO RESPOND WITHIN 24 HOURS, HOWEVER ADDITIONAL NOTICE <br />MAY SOMETIMES BE REQUIRED AT SOMETIME IN THE FUTURE. <br />21. THE PERMIT AND AN APPROVED SET OF DESIGN DOCUMENTS MUST <br />BE ON THE JOB SITE AT ALI- TIMES <br />22. THE INSTALLER AND/OR OWNER ARE SOLELY RESPONSIBLE FOR <br />ENSURING THAT ALL PROPERTY BOUNDARIES ARE ACCURATELY <br />MARKED, THAT ALI APPROPRIATE SETBACKS ARE OBSERVED, AND <br />THAT UNDERGROUND AND/OR OVERHEAD UTILITIES AND/OR UTILITY <br />EASEMENTS ARE IDENTIFIED PRIOR TO CONSTRUCTION. <br />23, UNDER NO CIRCUMSTANCES SHALL THE DISPOSAL, OR REPLACEMENT <br />AREAS, OR RELATIVE POSITIONS OF THE OTHER SYSTEM COMPONENTS, <br />BE MODIFIED WITHOUT PRIOR CONSENT' FROM THE DESIGNER AND THE <br />REGULATORY AILFFHORITY <br />24, IF 1HE SOLL IN THE DISPOSAL AREA CAN BE FORMED INTO A RIBBON <br />IT IS TOO WET 1-0 EXCAVATE. DO NOT REMOVE VEGETATION, OPERATE <br />EQUIPMENT', OR 01-1-IERWISE DISTURB SOILS IN THE DISPOSAL AREA <br />UNTIL RECEIVING APPROVAL FROM "THE DESIGNER. <br />25. DISTURBANCE OF NATIVE SOILS IN -THE DISPOSAL AND/OR <br />REPLACEMENT AREAS AND FOR A DISTANCE OF 50 FEET BELOW THE <br />DISPOSAL OR REPLACEMENT AREA MAY CAUSE PREMATURE SYSTEM <br />FAILURE. DO NOT ALLOW VEHICULAR 'TRAFFIC, CONSTRUCTION <br />EQUIPMENT, OR LIVESTOCK IN THE AREA WITHIN OR BELOW THE <br />DISPOSAL. OR REPLACEMENT AREAS. <br />26DO NOT DIRECT CONCENTRATED SURFACE WATER RUNOFF ONTO <br />ADJACENT PROPERTIES. <br />27ALL SEPTIC SYSTEMS, REGARDLESS OF TYPE, HAVE FINITE LIFE SPANS <br />AND AS SUCH WILL NOT OPERATE INDEFINITELY. IN ACCEPTING THIS <br />PLAN, THE OWNER UNDERSTANDS AND ACCE P TS THAT REPAIR AND/OR <br />REPLACEMENT OF ALL OR PORTIONS OF THIS SYSTEM WILL LIKELY BE <br />REQUIRED AT SOMETIME IN THE FUTURE. <br />28. THIS SYSTEM IS DESIGNED TO ACCOMMODATE A FINITE QUANTITY OF <br />WASTEWATER, ADDITIONAL WASTEWATER WILL.. NOT BE 'TREATED <br />PROPERLY BY THIS SYSTEM AND WILL DAMAGE ITS COMPONENTS. <br />WASTEWATER GENERATION EXCEEDING THE DAILY DESIGN FLOW RATE <br />LISIED ELSEWHERE ON 'THESE PLAINS IS LIKELY TO DAMAGE THE <br />SYSTEM OR CAUSE FAILURE AND IS STRICTLY PROHIBITED. <br />29. THE CREATION OF CUT BANKS BELOW THE DISPOSAL OR <br />REPLACEMENT AREAS INCREASES THE POSSIBILITY OF INTERCEPTION <br />AND SURFACING OF MIGRATING EFFLUENT AND SHOULD ALWAYS BE <br />AVOIDED. CUT BANKS BELOW THE DISPOSAL OR REPLACEMENT AREAS <br />ARE CREATED SOLELY AT THE RISK OF THE OWNER. <br />-IN OR BELOW THE DISPOSAL <br />30THE DISTURBANCE OF' NATIVE SOILS WIT[ <br />OR REPLACEMENT AREAS INCREASE THE POSSIBILITY OF SOIL <br />STRUCTURE DAMAGE AND MAY LEAD TO DISPOSAL FIELD FAILURE. <br />DISTURBANCE OF NATIVE SOILS WITHIN OR BELOW THE DISPOSAL. OR <br />REPLACEMENT AREAS BY ANY MEANS INCLUDING VEHICULAR TRAFFIC, <br />GRADING, LIVESTOCK, ETC.. IS PROHIBITED AND WILL INVA[ IDATE THIS <br />C�PYR!�HT _�O17_ NORTHSTAR EN�|NEER|NG �RDUP, (NC� <br />CUENT FOCUSED PASSION DRIVEN <br />620 12th Street Modesto, CA 953,54 <br />(209) 524--3,525 Phone (209) 524-3526 Fox <br />CROSS <br />-IONS <br />SECI <br />